Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />4.3 Injection Test Procedures <br />Data loggers were deployed in wells OBS-1, AS-2 and MW-5 on January 26, 2015 to measure <br />background water level, DO, and ORP in each well prior to initiating air injection into the first test <br />well (AS-1). Injection testing at AS-1 was conducted on January 27, 2015 at three progressively <br />higher injection flow rates. Following the completion of AS testing at AS-1, the data loggers <br />remained deployed in OBS-1 and MW-5 to collect recovery data, and testing at AS-2 was <br />conducted on January 28, 2015 in the same manner as the first test with the exception of the data <br />logger from AS-2 being relocated to AS-1. The data loggers were removed on January 29, 2015. <br />Groundwater was at an average of approximately 99 feet below TOC at the time of testing. <br />Observation wells for AS testing at AS-1 (screened 110 to 115 feet bgs) were as follows: <br />Observation <br />Well <br />Screen Interval <br />(feet-bgs) <br />Distance from AS-1 <br />(feet) <br />Pre-test Depth to Water <br />(feet below TOC) <br />OBS-1 80 to 120 15 99.31 <br />AS-2 110 to 115 20 98.62 <br />MW-5 80 to 100 28 98.79 <br />VW-1 30 to 60 23 NA <br />NA = not applicable <br />Observation wells for AS testing at AS-2 (screened 110 to 115 feet bgs) were as follows: <br />Observation <br />Well <br />Screen Interval <br />(feet-bgs) <br />Distance from AS-2 <br />(feet) <br />' Pre-test Depth to Water <br />(feet below TOC) <br />OBS-1 80 to 120 7.5 99.31 <br />AS-1 110 to 115 20 99.20 <br />MW-5 80 to 100 42 98.79 <br />VW-1 30 to 60 9 NA <br />NA = not applicable <br />As discussed previously (Section 3.4), the observation wells OBS-1 was constructed with 2-inch <br />schedule 80 PVC, 0.020-inch slot, and a 40-foot screened interval (80 to 120 feet bgs). Injection <br />wells AS-1 and AS-2 were constructed with 2-inch schedule 80 PVC, 0.010-inch slot and a five foot <br />screened interval (110-115 feet bgs). Vapor well VW-1 was constructed with 2-inch schedule 80 <br />PVC, 0.020-inch slot and a 30 foot screened interval (30-60 feet bgs). <br />The data loggers were deployed in wells OBS-1, MW-5 and AS-2 on January 26, 2015 to collect <br />background data prior to initiating air injection into test well AS-1. The Data loggers remained <br />deployed in wells OBS-1 and MW-5 until they were removed on January 29, 2015 in preparation <br />for the start of testing at AS-2. The data logger from AS-2 was relocated into well AS-1 prior to <br />initiating air injection into test well AS-2. Each data logger was set approximately three feet below <br />the groundwater surface. <br />Testing included monitoring the groundwater and vadose zone conditions before, during, and after <br />testing. This included field measurements of observation well head pressure, VOC soil vapor <br />concentration, DO, ORP, and groundwater levels from the observation wells. The injection wells <br />4-3 The Source Group, Inc.