My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COPPEROPOLIS
>
10848
>
2900 - Site Mitigation Program
>
PR0536777
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 2:35:44 PM
Creation date
5/27/2021 2:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536777
PE
2960
FACILITY_ID
FA0021126
FACILITY_NAME
FORMER COUNTRYSIDE MARKET
STREET_NUMBER
10848
STREET_NAME
COPPEROPOLIS
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10311006
CURRENT_STATUS
01
SITE_LOCATION
10848 COPPEROPOLIS RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />were monitored for air and helium injection flow rates, pressure, and temperature using the <br />rotameters, pressure gauges, and temperature gauges installed on the AS manifold. <br />Background soil vapor samples were collected from OBS-1 and VW-1 for laboratory analysis on <br />January 19, 2015 prior to the start of injection. Soil vapor samples were also collected from OBS-1 <br />and VW-1 for laboratory analysis at the end of each AS test. <br />Background groundwater samples (low-flow purge) were collected from OBS-1, AS-1, and AS-2 for <br />laboratory analysis on January 13, 2015 prior to the start of injection. Low-flow purge groundwater <br />samples were also collected from OBS-1, AS-1, and AS-2 for laboratory analysis after the final test. <br />All groundwater samples were submitted to a State-certified laboratory for analysis. <br />The field monitoring data (tabulated) collected during the test is provided as Appendix I. Raw data <br />collected by the data loggers is provided as Appendix J. The laboratory reports and COC <br />documents from the soil vapor and groundwater samples are provided as Appendix E. <br />4.4 AS-1 Testing Discussion and Results <br />4.4.1 Breakthrough Testing (AS-1 Testing) <br />After conducting pre-test sampling and monitoring/shakedown of the equipment, initial <br />breakthrough testing was started (January 27, 201 at approximately 11:00 AM) by initiating air flow <br />into AS well AS-1. Injection air pressure was incrementally increased to determine the minimum <br />pressure required to displace the groundwater above the top of the screened interval and induce <br />measurable airflow into the sparge well (min). <br />Estimated Breakthrough Pressure: <br />Grnin (psi) = 0.4 (psi/foot) x Water Column above Top of Screen (feet) <br />Breakthrough pressure was observed between 9 and 12 pounds per square inch gauge pressure <br />(psig). This pressure is greater than the estimated breakthrough pressure, and below the <br />overburden pressure of the formation. The overburden pressure (Gmax ) represents the upper limit <br />for injected air pressure and is calculated as follows assuming a dry soil density of 100 pounds <br />per cubic foot: <br />Gmax (psi) = 0.7 (psi/foot) x Total Depth (feet)(base of screen) <br />4.4.2 Injection Flow (AS-1 Testing) <br />Once breakthrough testing was completed, SGI conducted "low-flow", "medium-flow", and "high- <br />flow" steps to evaluate the feasibility of air sparging within a range of flows. During low-flow testing, <br />the injection flow rate was maintained at approximately 5 scfm at an average pressure of 8 psig. <br />During medium-flow testing, the injection flow rate was maintained at approximately 10 scfm at an <br />average pressure of 10 psig. During high-flow testing, the injection flow rate was maintained at <br />approximately 20 scfm at an average of 13 psig. Air injection at AS-1 was conducted for a total of <br />4-4 The Source Group, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.