Laserfiche WebLink
1. In a 2 Feb 2018 letter, I approved 5 CPT borings to delineate the extent of impact to GW. <br /> 2. A Work Plan is needed for the soil/soil gas sampling discussed above. <br /> 3. The CPT work can be deferred until the soil/soil gas sampling has been approved, and all the assessment <br /> work can be completed at the same time. <br /> 4. Please submit the 3Q18 GMR by 30 Oct 2018. <br /> a. Please address the informational gaps discussed in Section I above. <br /> 5. Please submit the Work Plan by 31 Dec 2018. <br /> Ada v�, M. -L/c eh der, P.G. <br /> Engineering Geologist I UST Enforcement Unit <br /> Central Valley Regional Water Quality Control Board <br /> California Professional Geologist#9340 <br /> 11020 Sun Center Drive, Suite 200, Rancho Cordova, CA 95670 <br /> Phone 916.464.4615 1 Fax 916.464.4704 <br /> aIan.buehler@waterboards.ca.gov <br /> m � rr <br /> y �5 <br /> if <br /> Total Control Panel Login <br /> To:bmillman@advgeoenv.com Remove this sender from my allow list <br /> From:alan.buehler@waterboards.ca.gov <br /> You received this message because the sender is on your allow list. <br /> 2 <br />