My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
0
>
2900 - Site Mitigation Program
>
PR0541818
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 11:41:05 AM
Creation date
5/28/2021 11:19:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541818
PE
2965
FACILITY_ID
FA0023982
FACILITY_NAME
SJC PUBLIC WORKS UTILITY MAINTENANCE DIVISION
STREET_NUMBER
0
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
24809015
CURRENT_STATUS
01
SITE_LOCATION
LINNE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irrigation/disposal for effluent disposal. In Section #1 of this report a complete process <br />description of the BioPureTM System is detailed. The BioPureTM system has been <br />permitted by the State Water Resources Control Board, (Central Valley Regional Water <br />Quality Control Board, Sacramento) in San Joaquin County as well as other Counties <br />throughout the State of California. <br />Wastewater Characteristics: <br />Design loadings for the Castello project are based on the following criteria; <br />Influent Raw Sewage Mg/1 lbs/day <br />Bio-Chemical Oxygen Demand: 250 63 <br />Total Suspended Solids: 225 56 <br />Total Nitrogen 45 11 <br />Design Wastewater Flows: <br />The Castello Project consists of eighty (83) residential lots. The size mix of houses will <br />be three (3) and four (4) bedroom. The flow assignment utilized for this project shall be <br />based on four (4) bedroom houses which results in the following; <br /># of Houses gallons/day/house Total GPD <br />83 350 29,050 <br />Wastewater Treatment Plant Capacity: <br />Utilizing the above data, the plant capacity selected for this project shall be a thirty <br />thousand (30,000) gallon per day facility. <br />Wastewater Treatment Plant Unit Processes: <br />The unit processes that make up the Bio-PureTm treatment system to be utilized for the <br />Castello Project are listed below; <br />.,, 3
The URL can be used to link to this page
Your browser does not support the video tag.