My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
0
>
2900 - Site Mitigation Program
>
PR0541818
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 11:41:05 AM
Creation date
5/28/2021 11:19:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541818
PE
2965
FACILITY_ID
FA0023982
FACILITY_NAME
SJC PUBLIC WORKS UTILITY MAINTENANCE DIVISION
STREET_NUMBER
0
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
24809015
CURRENT_STATUS
01
SITE_LOCATION
LINNE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Treatment & Disposal Systems Standby Power: <br />Inquires made to the purveyor of electrical power to this area (PG&E) reveal that <br />occasional power outages occur that have durations of four (4) hours and less. Although <br />this duration of power outage can be accommodated within the plant's influent <br />equalization system, the Developer of the Castello Project has opted to have 100% stand <br />by power generation installed. This unit will be designed with an automatic transfer <br />switch to function during non-plant attendance. In addition, this function will be <br />monitored with the plant computerized TC2K system. <br />Wastewater Treatment Systems Esthetics and Security: <br />Plant Location: <br />The Wastewater Treatment Plant will be located on a portion of Lot #65. This lot <br />is located adjacent to the Storm Water Retention Pond. The location is shown on DWG <br />#2 in Section IV of this report. <br />Esthetics and Security: <br />The plant site will be bounded by a six (6) foot chain link fence with a locked gate <br />entry. The treatment plant and appurtenant equipment will be placed inside a locked <br />building. The facility will be unrecognizable from the outside as a Wastewater Treatment <br />Facility. The influent equalization tank and pumping station will be outside the building <br />but will be buried with only manhole covers at the ground surface. The entire Bio- <br />Purem treatment process, including the aerobic solids digestion system will be inside the <br />building. <br />Mitigation of Potential Odors: <br />By the very nature of all the treatment processes being "aerobic", the potential for <br />obnoxious odors being produced is practically nil. With the system being placed inside a <br />7
The URL can be used to link to this page
Your browser does not support the video tag.