Wastewater Treatment & Disposal Systems Standby Power: <br />Inquires made to the purveyor of electrical power to this area (PG&E) reveal that <br />occasional power outages occur that have durations of four (4) hours and less. Although <br />this duration of power outage can be accommodated within the plant's influent <br />equalization system, the Developer of the Castello Project has opted to have 100% stand <br />by power generation installed. This unit will be designed with an automatic transfer <br />switch to function during non-plant attendance. In addition, this function will be <br />monitored with the plant computerized TC2K system. <br />Wastewater Treatment Systems Esthetics and Security: <br />Plant Location: <br />The Wastewater Treatment Plant will be located on a portion of Lot #65. This lot <br />is located adjacent to the Storm Water Retention Pond. The location is shown on DWG <br />#2 in Section IV of this report. <br />Esthetics and Security: <br />The plant site will be bounded by a six (6) foot chain link fence with a locked gate <br />entry. The treatment plant and appurtenant equipment will be placed inside a locked <br />building. The facility will be unrecognizable from the outside as a Wastewater Treatment <br />Facility. The influent equalization tank and pumping station will be outside the building <br />but will be buried with only manhole covers at the ground surface. The entire Bio- <br />Purem treatment process, including the aerobic solids digestion system will be inside the <br />building. <br />Mitigation of Potential Odors: <br />By the very nature of all the treatment processes being "aerobic", the potential for <br />obnoxious odors being produced is practically nil. With the system being placed inside a <br />7