My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
0
>
2900 - Site Mitigation Program
>
PR0541818
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 11:41:05 AM
Creation date
5/28/2021 11:19:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541818
PE
2965
FACILITY_ID
FA0023982
FACILITY_NAME
SJC PUBLIC WORKS UTILITY MAINTENANCE DIVISION
STREET_NUMBER
0
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
24809015
CURRENT_STATUS
01
SITE_LOCATION
LINNE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dave Olmstead 2 17 May 2000 <br />A polishing pond is typically required for subsurface disposal of effluent from a package <br />treatment plant. As described, the pond does not appear to be included. In addition, a <br />typical discharge specification requires a minimum concentration of 1.0 mg/I dissolved <br />oxygen in all ponds; the system tedmical description states 0.5 mg/1 dissolved oxygen will <br />be maintained. <br />W.D.O., Inc. will be required to monitor the water quality of the wastewater effluent on a <br />monthly basis; groundwater quality will be monitored on a quarterly basis. The water <br />balance and pond designs for the subsurface disposal system must consider the capacity to <br />accommodate allowable wastewater flow, design seasonal precipitation, seasonal ancillary <br />inflow, and infiltration during the wet season. Design seasonal precipitation shall be <br />based on total annual precipitation using, a return of 100 years, distributed monthly in <br />accordance with historical rainfall patterns. <br />W.D.O., Inc. will be required to submit an Operation and Maintenance Plan prior to <br />operating the system. The plan must be prepared under the supervision of a registered <br />engineer. <br />Limits will be set for the quality of wastewater effluent to prevent further degradation of <br />groundwater quality in the area. <br />We have not specified a due date for the updated RWD. You may submit it at your convenience, <br />but please note that it can take up to four months from receipt of a complete RWD to adoption of <br />WDRs, and that no discharge of wastewater to the system will be allowed until WDRs are <br />adopted. <br />Please call me at (916) 255-3116 if you have any questions regarding this request for additional <br />information. <br />TIMOTHY R. O'BRIEN <br />Waste Discharge to Land Unit <br />Lower San Joaquin River Watershed <br />Enclosures: Additional Information Requirements <br />Form 200 <br />Groundwater Well Installation Guidelines <br />cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br />Lloyd Hedenland, Sr., 7-H Technical Services Group, Inc., Grass Valley <br />C:TrojectfilesSitcs'Castello Estaies`Olnaga4051200DOC
The URL can be used to link to this page
Your browser does not support the video tag.