Laserfiche WebLink
4, .,... ... . . a State Water Resources Contr011 Board <br />Division of Financial Assistance <br />0 <br />1001 1 Street • Sacramento, California 95814 <br />Winston H. Hickox P.O. Box 944212 • Sacramento, Califomia • 94244-2120 <br />Secretary for (916) 341-5768 • FAX (916) 341-5806 . www.swrcb.ca.gov/cwphome/ustcf <br />Environmental <br />Protection <br />Gray Davis <br />Governor <br />The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br />For a list of simple ways you can reduce demand and cut your energy costs, see our website at www.swrcb.ca.gov <br />February 18, 2003 <br />Connell Motor Truck Co., Inc. <br />Attn: K. Harrigfeld <br />2291 March Ln., B-100 <br />Stockton, CA 95207 <br />RECENED <br />FEB 2 6 2003 <br />ENVIRONMENT HEALTH <br />PERMIT/SERVICES <br />PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 14483 <br />SITE ADDRESS: 2211 WILSON WAY, STOCKTON, SAN JOAQUIN COUNTY <br />I have reviewed your request, received on January 17, 2003, for pre-approval of corrective action costs. <br />The total cost pre-approved as eligible for reimbursement for completing the November 14, 2002 <br />worlcplan approved by the San Joaquin County Environmental Health Department (County) is $58,993; <br />see the table below for a breakdown of costs. Please Note: The installation of Monitoring Wells 1D and <br />10D are approved as stated in the County's December 12, 2002 letter; Monitoring Well 10S is pre- <br />approved only if the County approves installation. <br />Be aware that this pre-approval does not constitute a decision on reimbursement: necessary corrective <br />action costs for work directed and approved by the County will be eligible for reimbursement at costs <br />consistent with those pre-approved in this letter. <br />All costs for corrective action must meet the requirements of Article 11, Chapter 16, Underground <br />Storage Tank Regulations in order to be eligible for reimbursement. <br />COST PRE-APPROVAL BREAKDOWN <br /># Task Amount Pre-Approved Comments <br />1 Monitoring well installation $9,237 <br />2 Lab analysis (soil and water) 19,580 <br />3 County drilling permit 89 <br />4 Saw cut concrete floor for wells 500 <br />5 Supervision and permit application 190 <br />6 Layout of drilling 190 <br />7 Installation supervision & sample retrieval 3,800 <br />8 Loader rental 750 <br />9 Install 5 CPT's 21,387 <br />10 Report writing 1,520 <br />California Environmental Protection Agency <br />4rs) %4 Recycled Paper