My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
2900 - Site Mitigation Program
>
PR0545106
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 12:10:36 PM
Creation date
5/28/2021 11:48:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545106
PE
3529
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Connell Motor Truck Co., Inc. 2 <br /># Task Amount Pre-Approved Comments <br />11 Remove purge water 1,250 1,000 Gals. <br />12 Misc. items (barrels, sample containers) 500 <br />TOTAL PRE-APPROVED $58,993 <br />Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will review <br />any tasks/costs that go beyond the pre-approved amount to determine if they are necessary and <br />reasonable. <br />If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br />new scope of work. <br />Although I have referred to the Foothill Engineering proposal in my pre-approval above, please be <br />aware that you will be entering into a private contract: the State of California cannot compel you to <br />sign any specific contract. <br />Please remember that it is still necessary to submit the actual costs of the work as explained in the <br />Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br />you will be reimbursed. Please insure that your consultant prepares their invoices to include the <br />required breakdown of costs on a time and materials basis, that invoiced tasks are consistent with the <br />original proposal, and that reasonable explanations are provided for any changes made in the scope of <br />work or increases in the costs. When the invoices are submitted you must include copies of all: <br />subcontractor invoices, <br />technical reports, and <br />applicable correspondence from the County. <br />Please call me at (916) 341-5768 if you have any questions. <br />Sine rely, <br />( <br />; <br />A- <br />Linda Sanborn, Associate Governmental Program Analyst <br />Technical Review Unit, UST Cleanup Fund <br />cc: Michael Infurna, Jr. <br />San Joaquin County EHD <br />304 E. Weber Ave., Third Floor <br />Stockton, CA 95202 <br />Foothill Engineering <br />12793 Paddy Creek Ln. <br />Lodi, CA 95240 <br />California Environmental Protection Agency <br />%4 Recycled Pnper
The URL can be used to link to this page
Your browser does not support the video tag.