My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
0
>
2900 - Site Mitigation Program
>
PR0545885
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 1:54:57 PM
Creation date
5/28/2021 1:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545885
PE
2960
FACILITY_ID
FA0025954
FACILITY_NAME
SPPL/ARCADY OIL CO
STREET_NUMBER
0
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
02
SITE_LOCATION
0 WHISKEY SLOUGH RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALVIN L. 1-RANKS, Ph.D. <br />ENGINEERING/ENVIRONMENTAL GEOLOGY <br />CONSULTANT <br />44 LAKESHORE CIRCLE <br />SACRAMENTO, CALIFORNIA 95831 <br />PHONE (916) 422-2841 <br />MONITORING PROGRAM FOR <br />ARCADY OIL COMPANY WASTE MANAGEMENT UNIT <br />HOLT, CALIFORNIA <br />By Alvin L. Franks CEG#88 <br />In <br />The Arcady Gil Company drilling mud disposal site was <br />put into operation under Waste Discharge Requirements issued <br />April 21, 1960. The requirements were brought up to date by <br />the Central Valley Regional Water Quality Control Board in <br />1976. The site was closed in May 1984 and will not receive <br />any more waste. <br />The Regional Board staff made an inspection of the site <br />and the Board issued a Clean up and Abatement Order on October <br />11,1984. <br />Subsequent to the Order, Arcady Oil has completed an <br />extensive drilling program to determine the nature of the <br />waste in the site and to construct wells to ascertain the <br />hydrogeology of the site. The wells were drilled and cased <br />on April 29,1984. The surface seals and protective cover <br />for the wells were installed the first portion of May 1985 <br />The survey of the area for well head elevations has not been <br />made. <br />Well Locatons and Construction Details <br />All of the new wells were drilled with a six inch contin <br />uous flight auger. The construction details for each of the
The URL can be used to link to this page
Your browser does not support the video tag.