My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
0
>
2900 - Site Mitigation Program
>
PR0545885
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 1:54:57 PM
Creation date
5/28/2021 1:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545885
PE
2960
FACILITY_ID
FA0025954
FACILITY_NAME
SPPL/ARCADY OIL CO
STREET_NUMBER
0
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
02
SITE_LOCATION
0 WHISKEY SLOUGH RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC: 07 '138. 15: 39 LEVINE-F-1 H. El. P. 5 <br />LEVINEFRICKE <br />Extraction Wells <br />The two extraction wells proposed south of Cook Road (see Figure 3) will be used to lower ground-water levels sufficiently to <br />induce floating petroleum product to flow towards these two <br />wells. Petroleum skimming equipment will be positioned at the <br />water/ petroleum interface to extract the floating product. The <br />third well proposed on Arcady property will be used as a <br />product-only extraction point to accelerate product recovery in <br />lower-permeability zones. <br />The wells will likely be completed with 5-inch diameter PVC <br />casing slotted from about 3 feet above to 10 feet below the <br />existing ground-water level. Clean Monterey Number 3 sand (or <br />equivalent) will be used as backfill material in the wells to a <br />height of approximately 1 foot above the slotted casing interval. <br />Bentonite will then be placed in the annular space above the sand <br />pack to isolate the perforated interval and surrounding sand from <br />overlying soil and cement grout. <br />Ground-water and product pumps will be installed in the two wells <br />south of Cook Road. These pumps will be controlled by sets of <br />sensors and timers which are triggered when appropriate <br />water/product levels are reached within the individual well. A <br />product-only pump will be installed in the extraction well to be <br />located on Arcady property. <br />It is anticipated that the two combination wells will be operated at <br />a ground-water extraction rate of about 2.5 gpm each, creating a <br />depression in the water level near the extraction wells of about 2 <br />to 3 feet. Water level declines away from these extraction wells <br />will be less. Product extracted from these and the product-only <br />well will be stored in a temporary on-site storage container for <br />subsequent pick-up by SPPL for recycling. Ground-water removed from <br />the two wells will be pumped to an on-site treatment facility <br />located on adjacent agricultural property. <br />Treatmti cisimindiatat <br />The ground-water treatment facility will likely consist of a <br />storage pond with aerating spray nozzles to remove dissolved <br />petroleum constituents prior to discharge into Trapper Slough. <br />RWQCB and Air Quality Management District requirements will be <br />integrated into the final design parameters. <br />After approval of the preliminary design by both SPPL and <br />regulatory agencies, final design of the extraction system will <br />be accomplished. Plans and Specifications will be prepared, as <br />necessary, to facilitate contractor installation. Final reports <br />will be prepared, as necessary, for regulatory agency approval <br />and files. <br />-4-
The URL can be used to link to this page
Your browser does not support the video tag.