Laserfiche WebLink
DEC 07 '8E1,15:40 LEVINE-FE E,H.B. • <br />LEVINEFRICKE <br />SCHEDULE <br />It is anticipated that Plans and Specifications for the <br />extraction system will be submitted to SPPL within four to six <br />weeks after receiving SPPL and RWQCB approval of the conceptual <br />design. Specific design parameters, such as pump types, aeration <br />and water treatment techniques, and location of facilities will <br />be discussed with SPPL and regulatory staff during the final <br />design phase. <br />It is anticipated that the extraction system can be installed and <br />operating before the onset of winter rains, normally expected to <br />begin in November.