My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0541894
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 10:50:12 AM
Creation date
6/1/2021 8:35:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541894
PE
2950
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2.3 Groundwater Sample Collection Methods <br />Groundwater samples will be collected from each boring. Based upon previous borings at the <br />Site and logs from the Diamond Walnut site, the first-encountered aquifer is expected to be a <br />fine sand layer at approximately 46 to 48 feet bgs. <br />LNAPL may be present in the samples. Prior to purging and sampling, the depth and thickness <br />of the LNAPL and the static water level will be measured using a multiphase interface <br />monitoring probe. <br />To collect the groundwater sample, after the boring has been drilled a 5-foot section of new <br />slotted %-inch diameter PVC well screen and new PVC blank casing will be installed into the <br />cased borehole, and the casing will be retracted 5 feet to expose the aquifer. Groundwater will <br />be purged with a stainless-steel bailer or by attaching a stainless-steel check valve to new <br />tubing, and oscillating the tubing to displace the water to the surface. If the aquifer is adequately <br />transmissive, water will be purged until the sediment is visually decreased or at least 1 liter has <br />been purged. <br />The sample will be collected into containers provided by the laboratory. Sample names will refer <br />to the boring number and groundwater sample depth interval, and labels will also show the date <br />and time collected and proposed analyses. Samples will be placed in a cooler chilled to <br />4 degrees Celsius pending delivery to the laboratory using chain-of-custody procedures. <br />2.2.4 Laboratory Analysis <br />Soil samples will be analyzed for TPHd by EPA Method 8015M with silica gel preparation by <br />EPA Method 3630C (Table 1). <br />Two containers will be filled for each groundwater sample. The samples will be filtered in the <br />laboratory with a 0.45-micron filter, prepared by silica gel cleanup, and analyzed for TPHd by <br />EPA Method 8015M. <br />The sample holding time is the length of time that a sample or sample extract can be expected <br />to remain representative of environmental conditions. The holding time for TPHd is 14 days. <br />It is anticipated that samples will be delivered to the laboratory or transferred to a laboratory <br />courier. If samples are shipped, they will be handled in accordance with Kennedy/Jenks SOG <br />on Sample Packaging and Shipping included in Appendix D. <br />2.2.5 Laboratory Quality Assurance/Quality Control (QA/QC) <br />Laboratory QC consists of a laboratory and a matrix component. The laboratory component <br />measures the performance of the laboratory analytical process during sample analyses, while <br />the matrix component measures the effects of a specific medium on the method performance. <br />Corrective actions for instrument calibrations or QC sample data that are out of compliance are <br />typically described in the laboratory-specific QA/QC program. <br />Additional Soil and Groundwater Sampling Work Plan, <br />BNSF Mormon Yard, Stockton CA <br /> <br />Page 7 <br />Iftybnsf211onsfwp \ wp1201811899020 00_mormon_yard1work_plan_id12018 mormon yard sampling wp_mwm doc
The URL can be used to link to this page
Your browser does not support the video tag.