My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0541894
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 10:50:12 AM
Creation date
6/1/2021 8:35:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541894
PE
2950
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2.2 Drilling and Soil Sample Collection Methods <br />The soil borings will be drilled and continuously cored using a hydraulic push-drive drill rig in <br />general accordance with the Kennedy/Jenks Standard Operating Guideline (SOG) included in <br />Appendix A. Based upon historic groundwater levels, the maximum depth of the soil borings is <br />anticipated to be 50 feet bgs; however if visual indications of petroleum hydrocarbon impact are <br />noted, the borings will be deepened until visual impacts cannot be noted. <br />The hydraulic push-drive system (GeoprobeTM or equivalent) will be advanced using a dual-wall <br />system with 3-inch outer diameter (OD) steel rods where the lead rod is fitted with a new <br />acetate liner. The soil core is collected in the acetate liner as the rods are advanced in 4-foot or <br />5-foot increments. The steel rods remain in place as the acetate liners are removed, so that the <br />borehole is continuously cased as it is advanced. <br />Borings will be logged in general accordance with the Kennedy/Jenks SOG included in <br />Appendix B under the supervision of a California Professional Geologist or Professional <br />Engineer. The boring logs will include soil descriptions using the Unified Soil Classification <br />System (USCS), labeled depths, record of penetrations and recoveries, visual indicators such <br />as staining and discoloration, olfactory indications of chemical impact, head space readings, <br />estimation of proportions of grain sizes, grading, and moisture content. <br />Indications of LNAPL will include staining, odor, headspace screening, the presence of black, <br />petroleum-like liquid, and iridescent sheen. Sheen will be tested by placing a small amount of <br />soil in water in a black vessel, such as a black plastic ladle, and visually assessing the presence <br />or absence of a sheen. <br />Discrete soil samples will be collected from each boring. If LNAPL is observed, soil samples will <br />be retained from soil immediately above a visible LNAPL zone, within the zone, and below the <br />zone. If LNAPL is not observed, soil will be retained from the fine-grained soil in the vadose <br />zone above first-encountered groundwater. <br />The desired sample interval is cut from the acetate liner when it is retrieved. The soil sample <br />interval will be sealed with TeflonTm tape, capped, labeled, and placed in a cooler chilled to <br />4 degrees Celsius pending delivery to the laboratory. Sample names will refer to the boring <br />number and soil sample depth interval, and labels will also show the date and time collected <br />and proposed analyses. Samples will be delivered to the laboratory using chain-of-custody <br />procedures. <br />Soil borings will be sealed with neat cement or hydrated bentonite chips in accordance with <br />SJCEHD requirements. Drilling residuals (soil cuttings and decontamination rinsate water) will <br />be placed in sealed containers, pending characterization and coordination for offsite disposal. <br />The containers will be properly labeled and placed in a secure location designated by BNSF. <br />Following acceptance, the drilling residuals will be transported to an appropriately permitted <br />offsite disposal facility. <br />Re-usable sampling equipment will be decontaminated between locations either by <br />steam-cleaning, or washing using non-phosphate soap, a potable water rinse, and a final <br />distilled water rinse. Decontamination will be done in accordance with the Kennedy/Jenks SOG <br />included in Appendix C. <br />Additional Soil and Groundwater Sampling Work Plan, <br />BNSF Mormon Yard, Stockton CA <br /> <br />Page 6 <br />\ fwybnsfansfwp wp \2018 \ 1899020 00_mormon_yard work_plan_d12018 mormon yard sampling wp_mwm doc
The URL can be used to link to this page
Your browser does not support the video tag.