Laserfiche WebLink
ATC Diesel Performance, Inc. <br />Proposal for Limited Phase II ESA <br />May 25, 2017 <br />Page 4 <br />cost estimate. All work will be invoiced on a time and materials basis. A detailed cost estimate <br />is included in Attachment 2. <br />6.0 ASSUMPTIONS <br />ATC identifies the following assumptions in addition to the assumptions identified in the applicable <br />contract agreement between ATC and Diesel Performance, Inc. <br />1. At a minimum, a portion of the documents, reviewed, and relied upon to develop this report <br />were largely generated by others. Any information obtained from those documents was <br />assumed to be accurate and has been used "as is" unless contrary compelling information <br />prevents such use. Consequently ATC cannot and does not guarantee the accuracy of <br />this data and makes no warranties for the referenced work performed nor the inferences <br />or conclusions stated in these documents.