My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
54
>
2900 - Site Mitigation Program
>
PR0542041
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 12:42:49 PM
Creation date
6/1/2021 12:38:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542041
PE
2950
FACILITY_ID
FA0024136
FACILITY_NAME
A-1 SAW AND MOTOR INC
STREET_NUMBER
54
Direction
N
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
54 N CLUFF AVE
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Kith [EH] <br />From: Michael Kith [EH] <br />Sent: Tuesday, September 05, 2017 10:25 AM <br />To: 'Mangine, Joe' <br />Cc: Maroon, Nathan <br />Subject: RE: 54 North Cluff Ave, Lodi, CA <br />I need a little more information: <br />The report must be on company's letter head and signed by a licensed engineer. <br />It must state that you are requesting an one-time exemption, by submitting the report in lieu of field <br />inspection that was supposed to take place on certain date. You understand that EHD inspection is required, <br />and this will not happen again. <br />Provide grout volume for each boring. <br />Provide information on the persons who performed the work or were on site. <br />If you have questions please contact me at 209-468-3444. <br />Michael Kith, Lead Sr REHS <br />San Joaquin County <br />Environmental Health Department <br />mkith@sjcehd.com <br />Phone: (209) 468-3444 <br />Fax: (209) 468-8392 <br />From: Mangine, Joe [mailto:JMangine(apartneresi.com ] <br />Sent: Thursday, August 31, 2017 1:40 PM <br />To: Michael Kith [[H] <br />Cc: Maroon, Nathan <br />Subject: 54 North Cluff Ave, Lodi, CA <br />Hi Michael, <br />As requested, the borehole backfilling specifications for the subject property are as follows: <br />On July 7, 2017, a total of six borings (2.5" diameter) were advanced to a total depth of 15' below ground <br />surface (bgs) using a direct-push drill rig (GeoProbe). Groundwater was not encountered. <br />Following soil sampling activities, each borehole was backfilled with cement grout. <br />Our driller (ECA, Inc.) used 15 gallons of water mixed with 235 pounds of portland cement to complete the <br />grouting activities. <br />Boreholes advanced in improved areas were capped with concrete and dye to match existing ground cover. <br />Boring logs are attached for your reference. <br />Please don't hesitate to contact me if any further information is needed. Thanks again Michael! <br />Joe Mangine, PG <br />1
The URL can be used to link to this page
Your browser does not support the video tag.