D <br />7 <br />SOUTH SAN JOAQUIN COUNTY FIRE AUTHORITY (Contact: [209] 831-6707) <br />a. Prior to construction, applicant shall submit construction documents to the South San Joaquin <br />County Fire Authority for review and approval. <br />1. Construction documents shall be designed to the current edition of the California Code of <br />Regulations, Title 24, as amended by the City of Tracy Municipal Code. <br />2. Deferred submittals shall be listed on the coversheet of each page. Each deferred submittal <br />shall be submitted, reviewed and approved by SSJCFA prior to installation. <br />3. Fire protection water supply must be submitted separately from construction permit. All piping <br />and installation shall be in accordance with CFC §507 & NFPA standards. Approval of grading <br />and/or on-site improvements does not grant installation of underground fire service. <br />4. Fire department connections <br />standards. A hydrant shall be <br />§6.4.5.4. FDC locations shall <br />construction permit. <br />shall be installed in accordance with CFC §912 and NFPA <br />placed within 100' of the FDC, in accordance with NFPA 14 <br />be approved by the fire code official prior to issuance of <br />b. Prior to construction, all-weather fire apparatus access roads shall be installed. Fire apparatus <br />access roads during construction shall have a minimum 20 feet unobstructed width in accordance <br />with CFC §503. <br />c. All hydrants shall be installed, inspected and tested prior to bringing combustible materials onsite, <br />including storage. <br />d. Knox boxes shall be required. Each tenant shall have keys placed in the key box. The operator of <br />the building shall immediately notify the Fire Authority and provide the new key where a lock is <br />changed or rekeyed. The key to such shall be secured in the key box. <br />e. Building and each tenant space shall be provided with approved address identification in <br />accordance with CFC §505. <br />f. Additional comments may occur upon submittal of construction documents. <br />SAN JOAQUIN COUNTY MOSQUITO AND VECTOR CONTROL DISTRICT (Contact: [209] 982-0120) <br />aI <br />Applicant must incorporate mosquito prevention best management practices for the design, <br />consfiruction, operations, and maintenance of the proposed stormwater pond. <br />SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (Contact: [559] 230-5937) <br />a. Applicant shall comply with Mitigation Measures provided by the District: <br />1. For each project phase, within 30 -days of issuance of the first certificate of occupancy, if <br />applicable, submit to the District a summary report of the construction start, and end dates, and <br />the date of issuance of the first certificate of occupancy. Otherwise, submit to the District a <br />summary report of the construction start and end dates within 30 -days of the end of each phase <br />of construction. <br />2. For each project phase, all records shall be maintained on-site during construction and for a <br />period of ten years following either the end of construction or the issuance of the first certificate <br />of occupancy, whichever is later. Records shall be made available for District inspection upon <br />request. <br />PA -2100077 —Conditions of Approval 7 <br />