Laserfiche WebLink
Waste Removal <br />Following the well destruction process, all drummed soil and groundwater will be removed and <br />properly disposed of. Documentation of the waste disposal will be included in a site closure <br />summary report. <br />Permitting <br />The revised permit applications and Table 1 Summary of Well Construction are enclosed. The <br />Master File Record forms and fees were mailed to EHD on August 24, 2017. Offsite access <br />agreements and encroachment permits were previously submitted to your office. <br />Schedule and Reporting <br />Following EHD approval of the well destruction permits the work will be scheduled. We will <br />provide EHD with at least 48-hours advance notice prior to beginning fieldwork. A summary of <br />the well destruction and site closure activities will be presented in a report, including a discussion <br />of the well destruction efficiency (grout volume used versus grout volume calculations). Copies <br />of the report will be submitted to both the appropriate County and State regulatory agencies. <br />If you have any questions or comments please contact Ground Zero at your convenience. <br />Respectfully, <br />Ground Zero Analysis, Inc. <br />Andrew Dorn, B.S. Geology <br />Californi Geologist-in- raini (GIT) #411 <br />Gregory P. Stahl, PG 5023 <br />CA Certified Hydrogeologist No. 264 <br />Enclosures: <br />Figure 2— Site Map <br />Revised Table 1 — Well Construction Permit <br />Grout Calculations <br />Revised Well Destruction Permits <br />cc: Mr. Sheldon Teranishi <br />Page 2 of 2