Laserfiche WebLink
PERMIT NO.: 1017-6MW-0537 <br />PERMITTEE: Ground Zero Analysis, Inc. <br />DATE: September 26, 2017 <br />IMMEDIATELY FOLLOWING COMPLETION FOR WORK PERMITTED HEREIN, PERMITTEE <br />SHALL FILL OUT AND MAIL NOTICE OF COMPLETEION PROVIDED BY GRANTOR. <br />Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State Standard <br />Specifications Reference to Engineer in the State Standard Specifications shall include State <br />Representative. <br />"Your attention is directed to Standard Specification, Section 5-1.36 Property and Facility <br />Preservation, and Business and Professions Code, Section 8771. Permittee shall physically <br />inspect the work site and locate survey monuments before work commencement. Monuments <br />that might be disturbed shall be referenced or reset in accordance with Business and Professions <br />Code." <br />"If feasible, monuments should not be set within the traveled way. All monuments that must be <br />set or perpetuated in paved surfaces, shall be constructed in accordance with Caltrans Standard <br />Specification Section 81 'monuments' and Standard Plan A74, Type D, or equal with prior <br />approval of the District Surveys Engineer." <br />"Copies of Corner Records filed or Record of Surveys recorded in compliance with the Business <br />and Professions Code shall be forwarded to the District Surveys Engineer." <br />This permit is not valid until Permittee has obtained permission from adjacent property owners, <br />Irrigation Districts, Cities, Counties or other interested parties to perform the proposed work. <br />Notwithstanding General Provision #4, your contractor is required to apply for and obtain <br />an encroachment permit prior to start of work. <br />In accepting this permit, the permittee agrees that when notified by the State to relocate his <br />facilities to accommodate proposed highway construction, that said facilities will be relocated by <br />the Permittee at Permittee's expense and Permittee hereby waives any claim for reimbursement <br />for the required relocation. <br />Except when necessary, as determined by the State Representative, no installation, construction <br />equipment or personal vehicles shall operate or park within the traveled way. <br />All work shall be conducted in such a manner that the excavation, excavated earth, materials and <br />equipment will not cause any inconvenience to the highway traffic or to traffic entering the <br />highway from any public or private approach. <br />No earth or construction materials are to be dragged or scraped across the highway pavement and <br />no excavated earth shall be placed or allowed to remain at a location where it can be tracked onto <br />the highway traveled way or any public or private approach by the Permittee's construction <br />equipment, or by traffic entering or leaving the highway traveled way. Any excavated earth or <br />mud so tracked onto the highway pavement or public or private approach shall be immediately <br />removed by the Permittee. <br />3 of 5