My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1680
>
2900 - Site Mitigation Program
>
PR0542184
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 4:03:29 PM
Creation date
6/1/2021 2:10:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542184
PE
2960
FACILITY_ID
FA0023781
FACILITY_NAME
FORMER GEORGES SERVICE
STREET_NUMBER
1680
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
255-100-39
CURRENT_STATUS
01
SITE_LOCATION
1680 W DURHAM FERRY RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
522
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
't PERMIT NO.: 1017-6MW-0537 <br />PERMITTEE: Ground Zero Analysis, Inc. <br />DATE: September 26, 2017 <br />All signs shall be installed in conformance with Caltrans Standard Plans. Upon nonperformance <br />or unsatisfactory performance by the Permittee, the Department of Transportation shall perform <br />this work and all costs for said work shall be borne by the Permittee. <br />In addition to the attached General Provisions (TR-0045), the following special provisions are also <br />applicable for installation and monitoring of groundwater monitoring wells: <br />1. Unless specifically authorized elsewhere in this permit, survey work shall not be performed: <br />On holidays or an afternoon proceeding a holiday. <br />In medians. <br />C. When work requires traffic control on lanes. <br />2. Permittee shall furnish, place and maintain required signs, safety equipment, traffic control, <br />and warning devices in accordance with Caltrans Manual on Uniform Traffic Control <br />Devices 2014. <br />All personnel shall wear hard hats and class 3 vests, shirts or jackets as appropriate. <br />Unless specifically authorized in this permit, markings within the right of way shall be <br />temporary. Paint used for markings shall be water-soluble and other markers shall be removed <br />upon completion of work. <br />Any collected data requested by Caltrans shall be furnished to Caltrans without charge. <br />Vehicles necessary for work may be parked in State Highway right of way off paved shoulders. <br />Auxiliary support and employee vehicles shall remain outside the right of way. <br />Permittee shall provide for the safe passage of pedestrians. <br />THIS PERMIT AUTHORIZES WORK ON CONVENTIONAL HIGHWAYS. <br />The State of California, Department of Transportation makes no assurance or expressed warranty <br />that the plans are complete or that the planned construction fits field conditions. Should additional <br />work or modifications of the work be required in order to meet established Department Standards <br />or in order to fit field conditions, the work shall be performed by Permittee as directed by the <br />State's Inspector. <br />4 of 5
The URL can be used to link to this page
Your browser does not support the video tag.