My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
2900 - Site Mitigation Program
>
PR0542201
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 4:35:41 PM
Creation date
6/1/2021 4:13:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542201
PE
2960
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
01
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1 <br />Typical Single and Nested Soil Gas Probe Design <br />Surface-i <br />Gas Tight Fitting <br />Probe Box (optional) <br />Neat-Cement Grout <br />(if permanent) <br />Or <br />Hydrated Bentonite <br />(if temporary) <br />Tubing — <br />(metal, nylon, PEEK, teflone) <br />1 Ft Dry Granular Bentonite <br /> Probe Tip <br />-1 Ft Sand <br />DBT <br />ST <br />DBT <br />-X- <br />ST <br />TL <br />Legend <br />BD = borehole diameter (inches) <br />DBT = dry bentonite thickness (ft) <br />ST = sand pack thickness (ft) <br />TL = tubing length (ft) <br />PEEK = Polyetheretherketone <br />Neat-Cement Grout <br />(if permanent) <br />or <br />Hydrated Bentonite <br />(if temporary) <br />-1 Ft Dry Granular Bentonite <br />Probe Tip <br />-1 Ft Sand DBT <br />-X- <br />ST <br />F -BD <br />ADVISORY - ACTIVE SOIL GAS INVESTIGATIONS <br />included in the project workplan if the project proponent chooses not to use <br />probe support for deep soil gas wells. <br />Neat-Cement Grout means a mixture in the proportion of 94 pounds of Portland cement and not <br />more than 6 gallons of water. Bentonite up to 5 percent by weight of cement (4.7 pounds of <br />bentonite per 94 pounds of Portland cement) may be used to reduce shrinkage. <br />3.2.2 Sampling Tubing <br />Small diameter (1/8 to 1/4 inch) tubing is typically used for probe construction, made of <br />material which will not react or interact with site contaminants. At sites where soil <br />July 2015 11
The URL can be used to link to this page
Your browser does not support the video tag.