Laserfiche WebLink
REPORT PREPARATION <br /> Ninyo & Moore will prepare a Site assessment report that will include a description of sampling <br /> methodology, sample analytical results and conclusions and recommendations. The report will <br /> contain tabulated data from the assessment, a map showing the soil boring locations, soil borings <br /> logs, groundwater sampling datasheets, and laboratory analytical reports. <br /> Based on Site background information and the information gathered during our site assessment <br /> activities, Ninyo & Moore will summarize the findings of the Site Assessment and make <br /> recommendations for the Site. Depending on the findings of the assessment, recommendations <br /> could include no further investigation, additional investigation including the installation and sampling <br /> of groundwater monitoring wells, and/or the preparation of a draft conceptual site model (CSM) for <br /> the Site. <br /> Schedule <br /> Ninyo & Moore will schedule the field assessment activities following the RWQCB's review and <br /> approval of this Work Plan. We anticipate requiring between 2 and 3 weeks to obtain a County permit <br /> and schedule the driller. The report documenting the assessment findings will be submitted to the <br /> RWQCB within two weeks following receipt of the final analytical laboratory reports. <br /> Sincerely, <br /> NINYO & MOORE <br /> Forrest McFarland, PG ris M. Larson, PG <br /> Senior Environmental Geologist Principal Environmental Geologist <br /> FSM/KML/slt <br /> Attachments: Figure 1 —Site Location <br /> Figure 2 —Site Plan <br /> Distribution: (1)Addressee (via GeoTracker) <br /> (2) Jerry Ripperda, JCC (via email) <br /> Ninyo&Moore 1 180 East Weber Avenue,Stockton,California 1403488001 I May 23,2019 5 <br />