My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MEASURE PESPONSIBLE _ <br /> C. A replacement willow grove Same as 1. a. AGENCY/PARTY MONITORING <br /> shall be planted along the Same as 1. a. <br /> rerouted course of South Paddy <br /> Creek. Planting details shall be <br /> Included in the wetland <br /> restoration plan. <br /> d. Perimeter drainage ditches Same as 2. a. <br /> with wide, shallow profiles and Same as 2. a. <br /> a gentle gradient shall be <br /> constructed and planted with <br /> grasses. Such ditches shall be <br /> indicated on the improvement <br /> plans. <br /> e• Silt fences shall be Same as 2. a. <br /> Installed at all points where Same as 2. a. <br /> storm-water drainage leaves the <br /> project site. Silt fence <br /> locations and construction <br /> details shall be shown on the <br /> improvement plans. <br /> f• Temporary storm drains e <br /> sumps shall be constructed within Same as 2. a. Same as 2. a. <br /> active landfill modules to <br /> control sediment. Construction Imp2ementation upon completion of each <br /> details shall be shown on the landfill module. <br /> improvement plans. <br /> g. Completed landfill modules Same as 2. a. <br /> shall be revegetated upon The Waste Board operating p g Permit will <br /> placement of final cover and not <br /> An operational permit will be issued be conditioned. <br /> later than October 15 of each <br /> year. by the California Waste Board. <br /> h. Landfill operations shall be Same as 2. a. and 1. g. Same as 1. <br /> limited to daylight hours. g. <br />
The URL can be used to link to this page
Your browser does not support the video tag.