Laserfiche WebLink
MITIGATION }MEASURES RESPONSIBLE AGENCY/PARTY MONITORING <br /> 2. Department of Public Works: <br /> a. An Improvement Plan, prepared San Joaquin County Public Works Improvement Plan approval shall be <br /> by a Registered Civil Engineer , Solid Waste Division received from the Public Services <br /> showing drainage, driveway access Division prior to construction. <br /> details, on-site parking, and Solid Waste Manager <br /> grading shall be submitted to the <br /> Department of Public Works, <br /> Public Services Division, for <br /> approval. <br /> b. The frontage improvements for San Joaquin County Public Works During Harney Lane widening project <br /> Harney Lane shall be constructed Deputy Director, Engineering Services construction project. <br /> to provide a through lane and a <br /> right-turn (stacking) lane south <br /> of the center line of Harney <br /> lane. <br /> C. A roadway dedication wide Same as 2. b. Same as 2. b. <br /> enough to allow for the frontage <br /> improvements is required on <br /> Harney Lane. <br /> d. A groundwater monitoring San Joaquin County Public Works The County Solid Waste Division <br /> program shall be prepared which Solid Waste Division reports quarterly to the RWQCB. <br /> is acceptable to the Central Solid Waste Manager <br /> Valley regional Water Quality The California Regional Water Quality <br /> Control Board. The program shall Control Board has issued Waste <br /> be implemented prior to initial Discharge and monitoring requirements <br /> on-site landfill operations. for the landfill. <br /> e. The project shall be designed Same as 2. a. <br /> and engineered so that proper Same as 2. a. <br /> channelization/detention of <br /> stormwater sheet flow is not <br /> diverted onto adjoining <br /> properties or does not cause <br /> increased flows in water courses <br /> and cause flooding. <br />