Laserfiche WebLink
Proiect Number 2098RV45 November 30 2017 <br /> SITE SAFETY PLAN FOR SITE INVESTIGATION ACTIVITIES <br /> 1744 West Hammer Lane <br /> Stockton, California <br /> Introduction• <br /> This Site Safety Plan (SSP) has been designed to address safety provisions needed <br /> during soil and groundwater investigation activities to be performed at and in the <br /> vicinity of the Park Woods Shopping Center (including Park Woods Cleaners) site <br /> located at 1744 West Hammer Lane in Stockton, California. Its purpose is to provide <br /> established procedures to protect all on-site personnel from direct skin contact, <br /> inhalation, or ingestion of potentially hazardous materials that may be encountered at <br /> the site. The SSP establishes personnel responsibilities, personal protective <br /> equipment standards decontamination procedures, and emergency action plans. <br /> The SSP describes means for protecting all on-site personnel from deleterious <br /> contamination or personal injury while conducting on-site activities. As described <br /> below all requirements promulgated by the California Department of Health Services <br /> will be met. <br /> Scope of Services <br /> E2C seeks to enter property described above for the purpose of drilling, soil vapor <br /> sampling, well installation, soil and groundwater sampling activities. Drilling <br /> equipment will be brought to the Site and operated by a subcontractor: <br /> J&H Drilling, Inc. <br /> 7431 Walnut Ave. <br /> Buena Park, CA 90620 <br /> (714) 994-0402 <br /> C-57 # 740854 <br /> During drilling operations, soil samples will be collected as described in the site <br /> investigation workplan dated November 15, 2017 during soil boring and monitoring <br /> well installation using direct push GeoProbe or hollow stem auger drilling equipment. <br /> All possible efforts will be made to collect undisturbed samples. Each sample to be <br /> chemically analyzed will be collected in a brass sleeve or plastic liner, capped with <br /> lined plastic lids, sealed with tape, and placed on ice in a cooler immediately. All <br /> Chain-of-Custody protocol will be followed. <br /> Drilling activities will also occur inside site building. When work indoors, adequate <br /> ventilation and lighting will be put in place before equipment operation and any <br /> working activities begin. For indoor drilling activities, and/or testing activities, either <br /> equipment exhaust will be extended to outdoors or adequate ventilation (all doors <br /> and/or windows open) with large industrial shop fans will be employed. Workspace <br /> carbon monoxide and VOC monitoring will be implemented throughout the indoor <br /> work process. During work time indoors, a PID will be used to monitoring indoor air <br /> condition periodically. Smoking inside the building is prohibited. <br /> Responsibilities of Key Personnel: <br /> All personnel on site will have assigned responsibilities. Mr. Aiguo Xu, P.E. of E2C <br /> E2C Remediation B-1 <br />