My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
517
>
2900 - Site Mitigation Program
>
PR0542583
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 11:49:28 AM
Creation date
6/11/2021 11:35:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542583
PE
2960
FACILITY_ID
FA0023692
FACILITY_NAME
GUARDINO & CRAWFORD
STREET_NUMBER
517
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13721410
CURRENT_STATUS
01
SITE_LOCATION
517 W FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdvancedGeo <br />Environmental <br />Wgs g <br />February 2018 <br />AGE Project No 95-0167 <br />Page 3 of 6 <br />LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br />Exclusion Zone Excavation Area A B C D Other <br />Reduction Zone Preserve samples A B C D Other <br />Support Zone Support functions A B C D Other <br />Specific protective equipment for each level of protection used is follows: <br />hard hat <br />steel-toed boots <br />Level D: half-faced respirator (if necessary) <br />gloves <br />safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate <br />canister for use with the involved substances and concentrations. No down-grading <br />changes of the specified levels of protection shall be made without the approval of the <br />site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Brian Millman / Erin Rottacker Oversee operations, collect samples <br />FIELD CREW: TASK: <br />Gulf Shore Construction Members Drill, collect samples, advance boring <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work.
The URL can be used to link to this page
Your browser does not support the video tag.