My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
2900 - Site Mitigation Program
>
PR0543854
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 4:58:27 PM
Creation date
6/11/2021 3:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543854
PE
2960
FACILITY_ID
FA0024935
FACILITY_NAME
FORMER CHEVRON 94054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
01
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE-SPECIFIC HEALTH AND SAFETY PLAN FOR WELL INSTALLATIONS <br />Potential Airborne Concerns <br />May 4, 2017 <br />CHEMICAL <br />(OR CLASS) <br />MONITORING <br />EQUIENT TASK <br />MONITORING <br />FREQUENCY/ <br />LOCATION <br />LEVEL FOR <br />RESPIRATOR USE <br />LEVEL FOR <br />WORK <br />STOPPAGE <br />collect a Draeger tube or use <br />UltraRae for benzene at a <br />frequency of 1 or 2 tubes per hour. <br />If Draeger tubes will not be use on <br />the project, please remove <br />references, <br />DON RESPIRATOR, <br />At donning respirator resp <br />level, determine cause of <br />exposure and implement <br />engineering controls to <br />reduce concentrations. <br />usage of <br />engineering <br />controls to <br />attempt to <br />never reach the <br />stop work level. <br />Oxygen/LEL Combustible Gas Meter Disruption of soil. <br />Disconnecting and <br />removal of piping. <br />Removal of the tank. <br />Removal of <br />contaminated soil. <br />From start of disruption of potentially <br />contaminated soil through removal <br />of any contaminated soil. <br /><19.5% use supplied air. > 10% LEL <br />Total particulate MIE Data Ram Soil disruption during <br />excavation, <br />Continuous. Move the device <br />around the boundaries of the <br />exclusion zone. <br />10 mg/m3 15 mg/m3 <br />PCBs Personal air sampling <br />pumps using NIOSH <br />Method 5503 consisting <br />of an SKC 226-39 tube <br />and 13mm glass <br />prefilter <br />During first two days <br />soil disruption to <br />understand the level <br />of exposure. <br />Collect 4 samples for each of two <br />days plus one blank for QC <br />0.5 ppm. Analysis should <br />be requested with <br />prompt turnaround. <br />2 ppm <br />20
The URL can be used to link to this page
Your browser does not support the video tag.