Laserfiche WebLink
ATTACHMENT <br /> NORTH COUNTY RCSL LEACHATE RETURN <br /> P <br /> North County LCRS Burden Due to Leachate Return to Unit: <br /> Peak Leachate Production for Modules 1-3: <br /> Peak unit production within last three years (Mar. '00- Mar. '03): 2,100 gpd <br /> Fraction of leachate reaching LCRS: 10% <br /> Quantity reaching LCRS 210 gpd <br /> LCRS Removal Capacity: <br /> Module 3 Sump Pump Discharge Capacity: 9 gpm <br /> Maximum hours of operation: 13 * hr/day <br /> Full LCRS Capacity: 7,020 gpd <br /> Increased Burden on LCRS: <br /> Increase in leachate burden on LCRS due to leachate return: 3.0 % <br /> *Thirteen hours of operation per day is based on eight hours of operation with direct return of <br /> leachate to the refuse and emptying the leachate tank, and five hours of operation during the <br /> night during which the tank is filled. <br /> File:Leachate Estimates.xls <br /> Sheet:leachate Retum Printed:4/2/03 <br />