Laserfiche WebLink
San Joaquin County Environmental Checklist <br /> Less than <br /> Significant <br /> Potentially with Less than <br /> Significant Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> XI. NOISE. Would the project: <br /> a. Expose persons to or generate noise levels in ❑ ❑ ■ O <br /> excess of standards established in a local general <br /> plan or noise ordinance or applicable standards of <br /> other agencies? <br /> b. Expose persons to or generate excessive ❑ ❑ ■ ❑ <br /> groundbome vibration or groundborne noise <br /> levels? <br /> C. Result in a substantial permanent increase in ❑ ❑ ■ ❑ <br /> ambient noise levels in the project vicinity above <br /> levels existing without the project? <br /> d. Result in a substantial temporary or periodic ■ ❑ ❑ ❑ <br /> increase in ambient noise levels in the project <br /> vicinity above levels existing without the project? <br /> e. Be located within an airport land use plan area,or, ❑ ❑ ❑ ■ <br /> where such a plan has not been adopted,within two <br /> miles of a public airport or public use airport and <br /> expose people residing or working in the project <br /> area to excessive noise levels? <br /> f. Be located in the vicinity of a private airstrip and ❑ ❑ ❑ ■ <br /> expose people residing or working in the project <br /> area to excessive noise levels? <br /> Setting <br /> Introduction and Methodology <br /> This chapter addresses noise impacts associated with the proposed permit <br /> revision of the NCRC&SL. Where significant noise impacts have been <br /> identified,mitigation measures to reduce noise impacts,where feasible,have <br /> been identified. <br /> Noise Terminology <br /> Brief definitions of noise terminology are provided below. <br /> Notice of Preparation for the June 2006 <br /> North County Recycling Center and Sanitary Landfill 2.59 <br /> Permit Revision AS 06307.06 <br />