Laserfiche WebLink
V <br />August 29, 2007 <br />This document presents the planned preparation for the rains of the winter of 2007/2008. <br />The objective of this plan is to provide six months of operation in wet weather. Some <br />details of this plan may be revised as needed to address conditions as they may develop <br />as winter approaches. <br />Winter refuse disposal is planned for two areas. The first area is the lower winter pad in <br />Module 4 (Figure 1). This winter pad comprises of compacted and oiled road base to <br />provide an accessible refuse disposal area when surface conditions prevent access to <br />the landfill during the winter. Refuse will be pushed off the lower winter pad to the west <br />and south. The lower winter pad is intended to be the primary wet weather pad through <br />the winter of 2007-08. <br />The second area is the upper winter pad on Module 3, now being extended. It is <br />anticipated that the extension will be completed by end of October. It is intended that this <br />winter pad will be available for use this winter and the next. Refuse will be pushed south <br />from this pad (Figure 1). <br />AZ614L•7i! U:Z011 i x41 d 1610► <br />Planned erosion control prevention measures include: <br />Placement of anti -erosion mats or three-step hydroseed on the new southern and <br />western side slopes of Module 4 (Figure 1). Selection of the method of erosion <br />control will be based on the availability of landfill staff for the placement of mats. <br />2 The shoulder at the top of the southern slopes of Module 4 will receive berms <br />directing the surface flow to downcomers. These downcomers will conduct rainwater <br />to the base of the slope, where it will then drain into the temporary retention pond <br />south of Module 4. Water entering the retention pond will be pumped into the site <br />drainage ditches, eventually entering the interim sedimentation pond. <br />North County Sanitary Landfill <br />Winterization Plan 2007/08 <br />San Joaquin County Public Works <br />Solid Waste Division <br />