Laserfiche WebLink
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM.GOVERNOR <br /> Collfornlo Ueporfinent of 7ronsporfafion <br /> OFFICE OF THE DISTRICT 10 DIRECTOR �� <br /> P.O.BOX 2048 I STOCKTON.CA 95201 �q- <br /> (209)948-]943 I FAX(209)94H-]1]9 TTY]11 <br /> w.aoeo <br /> June 75, 2022 <br /> lO-SJ-S-PM R011.648 <br /> PA-2100114, PA-2100116 <br /> Ravjinder, Karlr, 8. Jorsharind erparl Singh TrosTees <br /> ShocK 8 Co. <br /> Scapho nie Stowers <br /> Son Joaquin County <br /> Community Development Deportment <br /> 1510 E. Hazelton Avenue <br /> Stockton, CA 95205 <br /> Dear Ms.Stowers: <br /> Tha California Department of Transportation appreciates the opportunity to review PA-21001 14 <br /> and PA-2100116, the proposed boat and RV storage. The project is located between W. 11th <br /> Street and Interstate 5,just south of the 1 1 th Street overcrossing on parcel 239-050-230. Tha <br /> project will include on office, 125 storage spaces, and o dump station. The Deportment Floe <br /> the following comments: <br /> 1. The comments of our previous latter doted July 75, 2027 hove not been addressed. <br /> Therefore, these comments ora still applicable and era copied below. <br /> 2. The site plan shows o 200 feel deceleration and 200 feet acceleration longs without <br /> boy to par to the proposed private driveway of 1 11^ street. The speed on 1 lf^Streai at <br /> this location is oT 55 mph, mea nin9 Phot both deceleration and acceleration length are <br /> provided inadequate length. Please provide o revised site plan with lengthened <br /> decelerofiion and occeleraiion tones to Coliro ns for review and comment prior To <br /> project approval. <br /> o. According to The Hig hwoy Design Manual pope 400-35 iha decelera Tion Ione <br /> length ai 55 mph is 485 feat.The site plan shows o length of only 200 feet. Please <br /> refer To current American Association of State Highway and Tro nsportotion <br /> Officials (AASHTO) Design Guidelines for length requirements needed for <br /> acceleration and deceleration tones into the proposed private rood project. <br /> b. Based on AASHTO Guidelines, when the speed Is zero (Stop condition) the <br /> required acceleration for o 55 mph road is 960 feet plus Ione drop transition <br /> length of 660 feet (L=S x W, see CGlifornio Manual on Uniform Traffic Control <br /> Devices or CMUTCD). This will result in a Total length of 1620 feet. If the 1620 feet <br /> length posses Tha bridge ahead on 1 7th street, Then the applicant must provide <br /> "Provide o sofa and reliable honsporfoflon network that serves all people pnd respects the anvlronmanf" <br />