Laserfiche WebLink
Ross Robert Truck Repair Waste Antifreeze Tank <br /> Interim Assessment and Conditional Certification <br /> September 18,2021 <br /> AST Integrity Assessment Inspection Checklist <br /> Tank Inspector Nancy Rebholtz Cert#: AST-6710 <br /> Site Name: Ross Facility Contact: Contact Tel No.: Date: 7/20/2021 <br /> Roberts Truck Repair Dan Payne <br /> Site Address: Tank Contents: <br /> Street 641 S. Harrison St City: Stockton Zip:_95206 Waste Antifreeze <br /> Tank Id(if any) Gross Capacity: Yr Installed: Tank Mfg.: Tank Model: <br /> Appr. 100 gal Unknown Unknown Unknown <br /> Previous Formal Inspections ® No ❑Yes ❑Unknown Date: Type: ❑Internal ❑External <br /> Copy of Prior Inspection Available?: ❑Yes ®No <br /> Owner Annual Inspections Review Owner Annual Inspections Review <br /> Copy of Inspection Available?: ❑Yes ®No Copy of Inspection Available?: ❑Yes ®No <br /> Operating Inspection Frequency <br /> ❑Annually ❑Monthly ❑Weekly ®Daily ❑Per Shift Recorded ❑Yes ❑No <br /> Tank Configuration(long. dimen.) Dimensions: Rectangular Tanks: L: W: H: <br /> ❑ Horizontal ® Vertical Cylindrical Tanks: Height: 36" Diam. 35"upper,24: <br /> lower <br /> Industry Standard(Fabrication&Nameplate Data) <br /> ❑UL 142 ❑UL 2085 ❑ UL 80 ❑ API 650 ❑ Other ®Not Determined <br /> Nameplate Shell Thickness: N/A in. Bottom Thickness: in. Shell Thickness: <br /> Dwg's Available? ❑Yes ®No Is Tank inside Building or Covered? Leak Test or Inspection Avail? <br /> Dwg ®Yes ❑No ❑Yes ®No If Yes,Date_ <br /> Overall Tank System Condition: ❑Good ®Fair ❑Poor_ Adequate? (if no, explain) ®Yes ❑No <br /> See 7.1 Recommendations <br /> Tank <br /> Primary Tank Material ❑Steel Ll Fiberglass ®Other HDPE Wall Thickness Basis: ❑UT ❑Spec ❑UL <br /> Secondary Containment <br /> ❑Integral DW Tank ®Containment berm Dimensions: 47"x 235"x a minimum of 8"high ❑Controlled Drain/Sump <br /> ❑None El Other(description) could not determine if this is double walled tank <br /> Liquid in Secondary Containment?: ❑Yes MNo If Yes,contents: <br /> Secondary Containment Material ❑Steel ❑Fiberglass MOther HDPE ❑None Wall Thickness_ <br /> Secondary Containment Condition ❑Good ®Fair ❑Poor Holes/cracks? ❑Yes MNo <br /> Degraded integrity? ❑Yes NNo Corrosion? ❑Yes MNo Paint Failure? ❑Yes MNo <br /> Secondary Containment Drain Valve ❑Good ❑Fair ❑Poor MNo Valve Adequate?(if no,explain) <br /> MYes ❑No <br /> How is Tank Level Determined? ❑ Electronic ❑Mechanical Tank Gauge Testing—Level Gauge <br /> ❑ Dipstick ❑ Sight Glass M Other Visual:Plastic,translucent Tank ❑ Pass ❑ Fail M Not Tested <br /> Level Gauge Operational? ❑ Yes ❑ No M N/A <br /> High Level Alarm EJ Yes M No If yes, El Audible El Visual Testing—High Level Alarm <br /> ❑ Pass El Fail ® Not Tested <br /> Description/Make/Model/Comments: <br /> Overfill Prevention ❑ Present ❑x Absent Testing <br /> Overfill Valve Installed: ❑ Yes M No ❑ Pass ❑ Fail ❑ Not Tested <br /> High Level Alarm Triggers Shutoff? ❑ Yes ❑ No <br /> 4 <br /> H:TROP-PRl\21-061-00 Ross Robert Track Repair Title 22\Deliverable\Antifreeze report\Ross Roberts Antifreeze Assessment 2021 0720.docx <br />