Laserfiche WebLink
Ross Robert Truck Repair Waste Antifreeze Tank <br /> Interim Assessment and Conditional Certification <br /> September 18,2021 <br /> F- AST Integrity Assessment Inspection Checklist (cont.) <br /> Leak Detection Testing <br /> Primary Tank ❑X Visual ❑ Continuous Interstitial Monitor ❑ Manual Monitor ❑ None ❑ Pass ❑ Fail ❑ Not Tested <br /> Secondary Tank ❑X Visual ❑ Continuous Interstitial Monitor ❑ Manual Monitor ❑ None ❑ Pass ❑ Fail ❑ Not Tested <br /> Piping ❑ Visual ❑ Continuous Interstitial Monitor ❑ Manual Monitor E None ❑ Pass ❑ Fail ❑ Not Tested <br /> Spill Prevention Adequate?(if no,explain) <br /> Spill Bucket ❑ Yes ® No If yes,Capacity E Yes ❑ No <br /> Venting Operable? <br /> Primary Tank Working Vent E Yes ❑ No Diam: open top port E Yes ❑ No ❑ NA <br /> Primary Tank Emergency Vent ® Yes ❑ No Diam: open top port © Yes ElNo ElNA <br /> Secondary Tank Working Vent ❑ Yes ❑ No Diam: ❑ Yes ❑ No ❑ NA <br /> Secondary Tank Emergency Vent ❑ Yes N No Diam: ❑ Yes [--] No ® NA <br /> Piping No system Piping <br /> Primary Piping Material: ❑Steel ❑Fiberglass ❑Other Diameter(in.) <br /> Piping Connection Type: ❑Threaded ❑Welded ❑Flanged ❑ Other <br /> Secondary Containment <br /> Piping: ❑Integral DW Piping ❑Containment berm ❑Controlled Drain/Sump ❑ None <br /> ❑ Other(description) <br /> Piping Secondary Containment Material ❑ Steel ❑ Fiberglass ❑ Other Diameter(in.) ❑ None <br /> Grounding/Bonding Adequate?(if no,explain) <br /> ❑Present ®Absent Secure? ❑Yes ❑No ®Yes ❑No <br /> Foundation Type: ®Concrete Slab ❑Housekeeping Pad ❑Ringwall ❑Asphalt ❑Saddle ❑Other <br /> Anchor Bolt Size: in. No.of Bolts: Condition ❑ Secure ❑ Not Secure ❑X Not Adequate?(if no,explain) <br /> Bolted ❑ Yes ® No tank needs <br /> Anchor Bolt Spacing: in. Anchor bolt to slab edge: in. to be anchored <br /> Foundation Condition ®Good ❑Fair ❑Poor ❑N/A Adequate?(if no,explain) <br /> Spalling? ❑Yes ®No Can Water Drain Away? ®Yes [:]No ®Yes [—]No <br /> Any Settlement? ❑Yes ®No Cracked? ❑Yes ®No <br /> Exposed Rebar? ❑Yes ®No Washouts/Voids? ❑Yes ®No <br /> Electrical <br /> Any loose or unprotected wiring? ❑ Yes ® No No electrical to tank <br /> Conduits,junction boxes,and other protective equipment sealed as required? [--] Yes ❑ No <br /> Emergency Shutoff Switch ❑ Yes ❑X No Tested? ❑ Yes ❑ No ❑ Not permitted to test <br /> Corrosion Protection Adequate?(if no,explain) <br /> ❑ Coating ❑ Cathodic Protection ® Other_HDPE tank ❑ None ® Yes ❑ No <br /> Coating Condition: Chalking Rating: (8-0,8=no chalking) <br /> Other Equipment <br /> ❑Pump,Internal(type,size) ❑Pump,External(type,size) <br /> ❑Day Tank ❑Drain Table ❑Filter Crush ❑Other ❑Electronic Monitor(Mfg/Model) <br /> Description/Comments: No other equipment attached to the tank. <br /> Placard Labeling <br /> ❑Present ❑No Smoking ❑Product Description: Waste Antifreeze ❑Hazardous Waste <br /> ®Absent ®HW Accum Start Date ❑UL Std No. ®Other: Hazardous Waste Handle with Care <br /> 5 <br /> H:TROP-PRl\21-061-00 Ross Robert Track Repair Title 22\Deliverable\Antifreeze report\Ross Roberts Antifreeze Assessment 2021 0720.docx <br />