Laserfiche WebLink
Sierra Chemical Co. <br />Hazardous Waste Management Plan <br />Table 1 <br />Generator Category <br />Amount of Hazardous <br />Amount of Acute <br />Amount of Residue or <br />(Hazardous Waste) <br />Waste Generated in a <br />Hazardous Waste <br />Contaminated Debris from a <br />and 40 CFR section <br />Month <br />Generated in a Month <br />Spill of Acute Hazardous <br />Waste <br />Conditionally Exempt Small <br /><100 kg or <220 lbs <br /><1 kg or <2.2 Ibs <br /><100 kg or <220 lbs <br />Quantity Generator (CESQG) <br />Small Quantity Generator <br /><1000 kg or <2200 lbs <br /><1 kg or 2.2 lbs <br /><100 kg or <220 lbs <br />(SQG) <br />Large Quantity Generator <br />? 1000 kg or? 2200 lbs <br />> 1 kg or < 2.2 lbs <br />>_ 100 kg or <220 lbs <br />(LQG) <br />Generator Category <br />Amount of Universal <br />(Universal Waste) <br />Waste Generated in a <br />Year <br />Small Quantity Handlers of <br />< 5000 kg of or <111000 <br />Universal Waste (SQHUW) <br />I Ibs <br />Large Quantity Handlers of <br />>_ 5000 kg or >_ 110000 lbs <br />Universal Waste (LQHUW) <br />4.1 Requirements <br />By operating as an LOG of hazardous waste, Sierra Chemical Co. must comply with the regulations <br />defined in 22 CCR Division 4.5 and in 40 CFR section 261: <br />• Make hazardous waste determinations on all solid wastes and maintain those records for at <br />least three (3) years from the date the waste was last shipped; <br />• Obtain an EPA Identification number; <br />• Use a manifest for all off-site shipments of hazardous waste; <br />• Mark and label each container of hazardous waste with appropriate labels including the words <br />"hazardous waste" and any other words that describe the contents <br />• Not accumulate waste on site for more than 90 days, unless in a designated satellite <br />accumulation area (see Section 5.0 of this plan); <br />• Place the waste in appropriate containers, tan(s, drip pans or containment buildings (see <br />Section 5.0 of this plan); <br />• Establish and document emergency preparedness procedures and contingency plans (see <br />section 10.0 of this plan); <br />• Conduct annual hazardous waste management training for those employees who handle and <br />manage the handling of hazardous waste (see section 9.0 of this plan); and <br />• Perform weekly inspections of the hazardous waste storage area. <br />By operating as <br />an SQHUW <br />of Universal Waste, <br />Sierra Chemical Co. <br />must comply with the <br />regulations set <br />forth in 22 CCR <br />Division 4.5 <br />and 40 CFR section <br />261: <br />• Store universal waste in containers or packages that are structurally sound and adequate to <br />prevent breakage; <br />• Select containers compatible with the universal waste; <br />• Ensure containers are closed except when adding or removing waste; <br />Prepared By: <br />Issue date: <br />Replaces: <br />Page: <br />ACT Environmental Services, Inc. <br />March 4, 2016 <br />NA <br />9 of 23 <br />