Laserfiche WebLink
the common design theme for the neighborhood and shall be consistent with the MHCSD Design <br /> Manual, Roadway Landscape Plans, and/or other applicable neighborhood design criteria. [SPII <br /> Implementation Measure 4.6(12)] <br /> Timing: Improvement Plans, Building Permits. <br /> 21. Design Guidelines: All proposed single family development and all proposed commercial <br /> development shall comply with the applicable provisions of the Trimark Communities, LLC Single <br /> Family Residential Design Manual and the Commercial, Office & Industrial Design Manual, as <br /> amended, respectively. For lands controlled by Shea Mountain House LLC, compliance shall be <br /> evidenced by written approval by Shea Mountain House LLC, or its Design Review Committee, in its <br /> sole discretion. For lands controlled by Trimark Communities, LLC, compliance shall be evidenced by <br /> written approval by Trimark Communities,LLC or its Design Review Committee, in its sole discretion. <br /> For non-Trimark properties, compliance shall be determined by San Joaquin County. [Specific Plan II <br /> Implementation Measure 4.3.3(1)] <br /> Timing:Condition shall be met prior to issuance of building permits. <br /> 22. Walls and Fences: All implementing projects shall comply with the applicable provisions of the <br /> Trimark Communities, LLC Design Manuals, asamended. <br /> ASQEJ_slLIURAL.BESOURCE <br /> 23. Agricultural Operation Phasing: An Agricultural Buffer and Conversion Phasing Plan shall be <br /> submitted to the Community Development Department and approved by the Director. The plan shall <br /> incorporate the following: <br /> • Phasing of areas from agricultural to urban use—locations and time frames; <br /> • Irrigation water supply and service plan approved by BBID; <br /> • BBID encroachment permits; <br /> • Temporary buffering that includes a 100-foot setback between the edge of development and <br /> ongoing agricultural operations as the project buildsout; <br /> • Permanent setbacks; <br /> • Landscape buffers; and <br /> • Fencing, signage or other suitable measures to minimize noise, spray drift and limit the <br /> potential for trespass on agricultural lands and BBID facilities. <br /> In addition, the plan shall address the following: <br /> • Chemical applications <br /> • Dust management <br /> Timing: Condition shall be met prior to approval of the first Final Map. [MP policies 3.2.4 g), <br /> h) and i] <br /> 24. Right To Farm Recordation And Notification: The deed of each parcel and of each condominium <br /> unit shall include the following recording notification, as specified by San Joaquin County Ordinance <br /> 4217 which added Section 6-9004 et. seq. to Chapter 1 of Division 9 of the San Joaquin County <br /> Ordinance Code regarding the Right to Farm Notice: "All persons purchasing lots within the boundaries <br /> of this approved map should be prepared to accept the inconveniences or discomforts associated with <br /> agricultural operations or activities, such as noise, odors, insects, dust or fumes. San Joaquin County <br /> has determined that such inconveniencies or discomforts shall not be considered to be a nuisance." <br /> Timing: Prior to approval of Final Map(s). <br /> NOISE <br /> PA-1000266—Conditions of Approval 5 <br />