Laserfiche WebLink
17. Record Drawings on Mylar and in digital format, consistent with the MHCSD file format, shall be <br /> submitted to MHCSD prior to acceptance of the improvements by the MHCSD. <br /> 18. Final Map Digital File: A digital file of the Final Map shall be submitted to the MHCSD and to the San <br /> Joaquin County Community Development Department. The digital file format shall be consistent with <br /> requirements of the County Assessor and Community Development Department GIS division and the <br /> MHCSD digital file format. Condition shall be met prior to approval of Final Map. <br /> 19. Geotechnical Report:All infrastructure designs shall be shown on the grading and improvement plans <br /> and shall comply with and incorporate the recommendations of the Geotechnical Engineering Studies. <br /> Condition shall be met before approval of FinalMap. <br /> 20. Environmental Hazards: Comply with all recommendations of the Environmental Site Assessment <br /> prepared for the project. Condition shall be met prior to beginning any construction on the related Final <br /> Map. Annual Reports, if applicable shall be submitted to the MHCSD Development Director. <br /> 21. Monitoring Agreement: The developer shall fund its fair share of the Community Monitoring and <br /> Mitigation Monitoring Programs, including the annual Traffic Monitoring Report. The developer shall <br /> also fund the MHCSD's efforts to monitor compliance with the Tentative Map conditions of approval. <br /> 22. Agricultural Drainage Improvement Phasing:A Surface and Subsurface Drainage Facilities Relocation <br /> and Improvement Plan shall be submitted to and approved by BBID and MHCSD Public Works <br /> Director. The plan shall include, but not be limited to, the following: <br /> • Phasing for relocation and improvement of existing surface and subsurfacedrainage facilities, <br /> as applicable. <br /> • Locations and timing of any applicable relocations; <br /> • Identification of "dewatering" areas and temporary or permanent methods for the dewatering <br /> system and connections to the storm water collection system, as determined necessary by <br /> the plan; <br /> • BBID Encroachment Permits. <br /> 23. The developer shall prepare an SB 221 report to address the community's potablewater supply needs <br /> prior to filing of any of the project's Final Maps. <br /> 24. Library Services: This project is subject to the Mountain House Master Plan conditions for <br /> Construction of a library. Construction of the Library shall begin when approximately 4,500 residential <br /> units in the Mountain House Master Plan area have been permitted. The library shall be completed <br /> within eighteen months of commencement of construction, unless an extension is approved by the <br /> MHCSD General Manager. The Library shall be dedicated to the MHCSD upon satisfactory <br /> completion. This condition can be satisfied by an agreement acceptable to the MHCSD that the <br /> required facilities will be constructed on this scheduleand if they are bonded for. <br /> 25. Fire Station: Prior to filing of the final map the second fire station shall be either constructed or, if <br /> approved by the General Manager, bonded for or, if determined by the General Manager, such other <br /> fire mitigation measure shall be provided that satisfies the Fire Protection plan as determined by the <br /> General Manager. The General Manager shall approve the location of the Fire Station. The Station <br /> shall be dedicated to the MHCSD. <br /> 26. Corporation Yard Facilities: Concurrent with the issuance of each building permit, the Applicant shall <br /> deposit in a MHCSD maintained Corporation Yard Facilities Capital Fund an amount equal to their <br /> pro-rata share (based on the CFF Plan Fee formula as determined by the MHCSD) of the total cost of <br /> the Corporation Yard Facilities as that cost is specified in the latest update of the CFF Plan Fees. <br /> Alternatively, the applicant may construct the Corporation Yard Facilities, subject to MHCSD design <br /> and location approvals. Construction shall begin prior to the 4,500th building permit within the Mountain <br /> PA-1000266—Conditions of Approval 11 <br />