My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:12:56 PM
Creation date
7/16/2021 12:52:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-17 <br />Progress Schedule <br />North County Landfill and Foothill Landfill Soil Gas Well Project 2009 <br />25 Working Days and 5 Demobilization Days <br />Date Task <br />May 27 Preconstruction Meeting. <br />May 27 Apply for Well Permits. <br />June 19 Order gates, well enclosures, HDPE tubing, lab cock valves. <br />July 14 Call for Underground Service Alerts for all well locations. <br />July 15-16 Receive HDPE tubing, weights, well enclosures, fence posts, <br />gravel, toilet and storage container at North County and Foothill. <br />July 17 Mobilize two drill rigs to North County Landfill.* <br />.July 20- July 24 1Drill and install soil gas wells at North County Landfill. <br />July 20-31 Install well enclosures, bollards, cow barriers and fencing at North <br />County Landfill. <br />July 27 Mobilize two drill rigs to Foothill Landfill.* <br />.July 27 -August 11 Drill and install soil gas wells at Foothill Landfill. <br />August 3- 21 Install well enclosures, bollards, cow barriers, and fencing at <br />Foothill Landfill <br />August 24-28 Demobilize from North County and Foothill Landfills. <br />*Method of drilling and well construction is by hollow stem auger unless site conditions <br />warrant a different type of method. <br />
The URL can be used to link to this page
Your browser does not support the video tag.