Laserfiche WebLink
O <br />Uco <br />C6I­ <br />JZ <br />Q W <br />Q <br />n <br />DUTIES FLOW CHART <br />CONSTRUCTION OF PERIMETER LFG MIGRATION <br />MONITORING WELLS AT THE NORTH COUNTY <br />AND FOOTHILL LANDFILLS PROJECT <br />FIELD ENG <br />DIVISION <br />R.E. <br />(JORGENSEN) <br />INSPECTOR <br />(BATTERSON) <br />(Solid Waste Staff) <br />Inspect Fencing, Bollards <br />Perimeter Migration Monitoring Well Project, Revised 4-18-09 <br />County Of San Joaquin -Public Works- Solid Waste <br />N:\2PerimLFGwells 08\Perim Well Proj-Duties flow chart.doc <br />MIKE CARROLL <br />Solid Waste Division <br />PROJECT ENGINEER <br />(J CHANDRA) <br />Solid Waste Division <br />INSPECTORS (3) <br />(VECTOR) <br />Inspect Drilling <br />and Well Installation <br />CONTRACTOR <br />(LFG CONTROL) <br />CI <br />(STAT CA) <br />LEA (SJC EHD) <br />Inspect Well <br />Installation <br />El <br />E <br />