Laserfiche WebLink
Table 2 <br />Preliminary Closure Cost Estimates <br />Final Cover Installation <br />$8,639,300 <br />Leachate Control Improvements <br />$17,500 <br />LFG Migration Monitoring and Control System <br />$31,500 <br />LFG Emission Monitoring and Control System <br />$213,500 <br />Groundwater Monitoring System <br />$21,000 <br />Drainage System <br />$125,000 <br />Security Installation <br />$87,500 <br />Structural Removal <br />$194,400 <br />Decommission of Environmental Monitoring/Control Systems <br />$0 <br />Survey Monuments <br />$24,000 <br />Total Construction Cost <br />$9,322,200 <br />Professional Services <br />$650,000 <br />Total Estimated Closure Cost <br />$9,972,200 <br />Contingency (20%) <br />$1,994,400 <br />Total <br />$11,966,600 <br />I Refer to Appendix D for Preliminary Closure Cost Estimate Details. <br />PCMP for NCRCSL Department o/ Public Works/Solid Waste <br />OASan Joaquin CountyINCRCSL 17180401PCPMPIF1na1 ReportlPCPMP-D R6. Doc County of San Joaquin - Rev. 02, July 10, 2009 <br />