|
SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS _ 10 6J 0 CR C-
<br />Ow CO RTE PM Agency
<br />CONSTRULTON OF TWO LANDFILL MODULES
<br />NO.
<br />TTEM NAME
<br />QUANTITY
<br />UNIT
<br />E09 -W. E.U-Im
<br />PRICE
<br />TOTAL
<br />Wood a-, W.
<br />PRICE TOTAL
<br />T C..6 uo0
<br />co y, ft.
<br />PRICE TOTAL
<br />NaNk MIduMlias. b.
<br />PRICE TOTAL
<br />Aas9cafeF
<br />PRICE
<br />TOTAL
<br />AVERAGE
<br />80
<br />PRICE
<br />FOOT KLL LANDFILL
<br />I MOBILWAION
<br />i
<br />LS
<br />$2700M
<br />5250.0
<br />S7,M.M
<br />59.00
<br />SIM.0.
<br />SIM..
<br />52000
<br />08,.4MM5.80DEMOBILEZATON
<br />2a
<br />t
<br />L$
<br />6JMM.8
<br />85.000.00
<br />$16,000.00
<br />518,000.00
<br />55,000.00
<br />SSMO..
<br />315 0M
<br />$15.000.00
<br />M(MM
<br />SE.MM
<br />514,000.M
<br />3
<br />FOUNDATION LAYER PREPARATION
<br />(U- Rasa)
<br />1.300.000
<br />SF
<br />$050
<br />$550.000.0
<br />SOA9
<br />$117.000.00
<br />SOAT
<br />S221,000.00
<br />SON5715.o.W
<br />$0.6
<br />$645.000.00
<br />38.37
<br />4
<br />SUBGRADE PREPARATION
<br />(user SMa si-ml
<br />310.000
<br />SF
<br />025
<br />577.500.00
<br />50.11
<br />$34.100.0
<br />$020
<br />562.00000
<br />SON
<br />818880.00
<br />SOAK
<br />S142A...
<br />634
<br />5GEOSYNTHETIC
<br />CLAY LINER
<br />1.650.000
<br />SF
<br />SOSO
<br />5825M0.W
<br />38.54
<br />38g/.m.0
<br />$050
<br />5825.000.00
<br />$0.52
<br />S8S8.00.0
<br />505 0
<br />875
<br />$.000.00
<br />$0.52
<br />6
<br />GEOMEM8RANE
<br />IrSD.0E
<br />SF
<br />0.45
<br />$74Z .00
<br />OA31
<br />$711.100.00
<br />50.42
<br />5693.00.00
<br />50.42
<br />$8950..00
<br />$0.42
<br />SMGUM.W
<br />50.42
<br />7
<br />GEOCOMPOSRE DRAIN MATERIAL
<br />345.000
<br />SF
<br />6.6
<br />5189.750.00
<br />WAS
<br />416.06.E
<br />38.45
<br />3155.250.00
<br />$0.45
<br />SIS5250.W
<br />50.46
<br />5158.700.0
<br />00.46
<br />6
<br />GRAVEL DRNNAGE LAYER
<br />1.3W.000
<br />SF
<br />50.85
<br />$1,105,000.00
<br />0.675
<br />4877,500.E
<br />$0.70
<br />$910.00.M
<br />$.75
<br />5975.00).M
<br />$0.90
<br />31.170,000.00
<br />50.76
<br />9
<br />SIMM GRAVEL
<br />300
<br />CY
<br />440.E
<br />3120M.M
<br />845.10
<br />SISSW.E
<br />430.E
<br />$9.00.8
<br />$20.0
<br />S6.OE.W
<br />545.0
<br />$13,58.00
<br />S35
<br />10
<br />41NCH DIAMETER NONPERFORATED
<br />HOPE SOIL GAS PIPE
<br />335
<br />LF
<br />SM
<br />6,76.0
<br />S17m
<br />SS595.B
<br />518.00
<br />38.06.8
<br />515.E
<br />6,0800
<br />S2S W
<br />38.375.00
<br />$18.75
<br />II
<br />44NCH DIAMETER PERFORATED
<br />HOPE 808 GAS PIPE
<br />7,900
<br />LF
<br />$IBIM
<br />51422MM
<br />572.70
<br />3100,36.E
<br />514.E
<br />SIIO. M.0
<br />515.E
<br />5118,500.E
<br />SISM
<br />$142200.00
<br />514M
<br />12
<br />41NCH DIAMETER NOAIPERFORATED
<br />HOPE LCRS PPE WITH SS WIRE ROPE
<br />700
<br />LF
<br />S22.W
<br />$16500.0
<br />$1425
<br />810.68750
<br />$14.00
<br />510.500.E
<br />514.0
<br />$10,000.00
<br />S30.E
<br />522,500.00
<br />S16106
<br />13
<br />4 -INCH DIAMETER PERFORATED HDPE
<br />LCR$ PPE WffH S.S. WIRE ROPE
<br />8.9E
<br />LF
<br />S2D.E
<br />SITB.OM.M
<br />$1525
<br />4135,725.E
<br />$14.W
<br />St24,60.W
<br />514.E
<br />5124.68.E
<br />$19.00
<br />$100,100.00
<br />SIS.$
<br />14
<br />64NCH pIARfrfER PERFORATED HOPE
<br />LCRS PIPE WRH SS WIRE ROPE
<br />1,010
<br />LF
<br />322.W
<br />522,220.8
<br />319.E
<br />519.190.E
<br />St5.8
<br />515.16..
<br />$IBM
<br />S181MM
<br />524.8
<br />$2420.00
<br />$IBM
<br />15
<br />124NCH DIAMETER NONAEWORATEO
<br />HOPE LCRS PIPE
<br />120
<br />LF
<br />525.E
<br />$3.000.0
<br />54350
<br />85,220.E
<br />SW.B
<br />S72M.M
<br />$WM
<br />6,68.E
<br />SLOE
<br />56.800.E
<br />$55.88
<br />16
<br />12 -MCH DIAMETER PERFORATED HOPE
<br />LORS PIPE
<br />20
<br />LF
<br />536.00
<br />5700.M
<br />SW25
<br />51,105.E
<br />S.-
<br />Sl2M.M
<br />380.00
<br />St,68.8
<br />$W.M
<br />$1,60.0
<br />$6.81
<br />17
<br />18-NCHCUMETERPERFWRATENHWE
<br />LCRS PIPE
<br />20
<br />LF
<br />$65.00
<br />81.100.E
<br />38250
<br />$156.00
<br />$IW..
<br />$2,000.0
<br />S100.E
<br />S2,M0.00
<br />5120.00
<br />$2.4W.M
<br />$IM.13
<br />18
<br />15INCH DIAMETER NONPERFORATED
<br />HOPE LCRS PPE
<br />120
<br />LF
<br />$W..
<br />SEIMW
<br />288.00
<br />38,16.8
<br />46.E
<br />39.8...
<br />S1M3M
<br />$12,000.00
<br />$75.00
<br />N.MO.M
<br />36.76
<br />19
<br />GEOTE%TILE
<br />1.500,000
<br />SF
<br />0.15
<br />5225,000.00
<br />0.135
<br />3a02,5M.W
<br />$0.15
<br />5225,MO.M
<br />$0.11
<br />S16,U00.W
<br />$0.15
<br />5225.0().8
<br />$0.14
<br />20
<br />BASE OPERATIONS SOB LAYER
<br />1,3M,0M
<br />SF
<br />0.6
<br />$76.000.00
<br />$0.16
<br />S2M,OM.M
<br />$020
<br />8260.000.0
<br />00.6
<br />576.000.00
<br />6.35
<br />$46,000.00
<br />50.33
<br />21
<br />SIDE SLOPE OPERATIONS SOB LAYER
<br />310,000
<br />BF
<br />0.75
<br />$232.5M.M
<br />50.19
<br />556,601M
<br />600
<br />893.00.00
<br />6.70
<br />8217.(MM
<br />WAS
<br />$139,SW.8
<br />SOA1
<br />22
<br />PROTECTIVE PLYWOOD COVER
<br />600
<br />SHEET
<br />$4.0
<br />32.76.E
<br />81350
<br />$9,16.00
<br />522.0
<br />$14.9M.0
<br />S25M
<br />SIT.M.00
<br />522.0
<br />814,'MSWM
<br />$20.63
<br />23
<br />SECONDARY CONCRETE CONTAIN
<br />STRUCTURE
<br />i
<br />LS444,000.E
<br />$4S0M.0
<br />543.5M.E
<br />543.60.M
<br />S1M.OM.E
<br />SIM,MO.M
<br />54 CMN
<br />$4008.00
<br />438.000.00
<br />$38,OMM
<br />$55.375.00
<br />21
<br />TRUCK LOADING CONCRETE APRON
<br />t
<br />LS
<br />6,OE.00
<br />S M)M
<br />615.500.E
<br />$15.60.00
<br />SXI.WM.E
<br />520.000.8
<br />SI5.E0.0
<br />$15,000.00
<br />$10.000.00
<br />810.000.E
<br />$IS.I25.M
<br />25
<br />LEACHATE STORAGE TIO(
<br />1
<br />LS
<br />$8.00.0S251000-00
<br />416.4M.M
<br />818.400.E
<br />$33.00.0
<br />$35.MO.E
<br />Sf0.M0.E
<br />SW.E0.0
<br />224M0M
<br />574.00.E
<br />3%.850.0
<br />8
<br />LEACHATE COLLECTION SUMP PUMP
<br />1
<br />LS
<br />88.000M
<br />56.,
<br />411.630.E
<br />511.630.00
<br />810,000.E
<br />$10.000.00
<br />3W.W0.0
<br />SM.000m
<br />38.00000
<br />MOMM
<br />$14 07.N
<br />27
<br />LEACHATE TRANSFER PIMP
<br />i
<br />LS
<br />S4.M0.8
<br />54.000.E
<br />$4.480M
<br />$6.46.M
<br />58.60.00
<br />S8.SM.W
<br />$15,OM00
<br />315.000.00
<br />$14000.00
<br />$12.00.00
<br />S%NSM
<br />28
<br />LEACIATE OSCHARGE PUMP
<br />1
<br />LS
<br />S4,OM.M
<br />34.MO.M
<br />$4.480.0
<br />$4,46.M
<br />KSWM
<br />S5.5W.M
<br />315.OM.M
<br />575,80.0
<br />$7.000.00
<br />$7 .00
<br />87,995.0
<br />29
<br />SUMPPUMPS
<br />1
<br />LS
<br />SIC, .00
<br />S2.00.M
<br />$1.6.00
<br />$1,000,.
<br />$8.00.0
<br />36AM.8
<br />S/0.OM.00
<br />f18M0.E
<br />48,500.0
<br />38.500.E
<br />56,395AM
<br />W
<br />LEACHATE FORCE SAN
<br />76
<br />LF
<br />S30M
<br />Sa5E.E
<br />$10.70
<br />$8,08.00
<br />$1230
<br />$9,375.00
<br />MM
<br />S1S,7SOM
<br />516.0
<br />ft2.M0.0
<br />$16.05
<br />31
<br />ABOVE GROUND LEACHATE MING
<br />1
<br />LS
<br />570,08.00
<br />81.80.00
<br />$12,2W.0
<br />4122W.N
<br />S6.(M.M
<br />MLOM.8
<br />$2.00.8
<br />220,000.0
<br />SBEO.M
<br />$8,000.00
<br />311,500.00
<br />32
<br />LEACHATECOLLECTONSYSTEM
<br />CONTROL PANEL
<br />t
<br />LS
<br />$12.000.00
<br />312000.0
<br />$IZN0.M
<br />$12.650.0
<br />$IS80.8
<br />315,000.00
<br />S7,E0.00
<br />$7500.00
<br />512,OM.M
<br />$IZOMM
<br />$11,78750
<br />33
<br />LEACHATE COLLECTION SUMP PUMP
<br />CONTROL PANEL
<br />1
<br />LS
<br />NMO.E
<br />S%NOM
<br />$5,960
<br />6,968.00
<br />SS,SOO.M
<br />SSSM.E
<br />SS000.00
<br />SSOMM
<br />$4.80.00
<br />$4.M.M
<br />35117.E
<br />MELECTRICAL
<br />SITE WORK
<br />1
<br />LS
<br />530.80.0
<br />$30.000.00
<br />86.60.8
<br />SB.BM.O
<br />510.000.00
<br />S10.E0AM
<br />$8.08.0
<br />WOW"
<br />SiSMO.E
<br />S7S0M.M
<br />$10.46.00
<br />35
<br />LIGHTNG SYSTEM
<br />t
<br />LS
<br />38,000..
<br />6.000.00
<br />$7.t6.0
<br />57.16.E
<br />$7.50.0
<br />$7,500.00
<br />38,60.8
<br />WOO M
<br />S7,OOO.M
<br />57.00M$7.03750
<br />36
<br />POWER SERVICE CONNECTION
<br />1
<br />LS
<br />$3,5M.W
<br />S35M.8
<br />$5.050.00
<br />55.06.0
<br />6000.00
<br />$5.000.00
<br />57.60.8
<br />$7.00.W
<br />SS,=.W
<br />6.00.8
<br />5563750
<br />n
<br />TELEPHONE SERVICE CONNECTION
<br />1
<br />LS
<br />$2500.00
<br />S2,SM.W
<br />886.E
<br />SE N
<br />SWO.00
<br />SODOM
<br />.0
<br />3800.00
<br />55000.00
<br />"Mm
<br />600.E
<br />31.ftsm
<br />S6
<br />INSTRUMENTATION AND MISCELLANEOUS
<br />EQUIPMENT
<br />1
<br />LS
<br />$ISOM..
<br />$1SOE.M
<br />5330.E
<br />$330..
<br />$60.8
<br />S5MA0
<br />5300.00
<br />53M.0
<br />$325JM
<br />5125.E
<br />$38175
<br />39
<br />LEACHATE FACILITY STARTUP TESTING
<br />AND DEMONSTRATION
<br />i
<br />LB
<br />6,OE.M
<br />35000.E
<br />600.E
<br />.E
<br />"Mm
<br />8500.00
<br />$20.00.00
<br />SM0MM
<br />5850.E
<br />S66.W
<br />6.45250
<br />40
<br />UNSATURATED ZONE MONITORING
<br />STATIONS
<br />4
<br />EA
<br />6.00.0S32=00,
<br />6,350.0
<br />537.48.E
<br />$15.000.00
<br />$6.mm
<br />38.00.00
<br />6880.8
<br />510.000.E
<br />54.000.00
<br />510.83150
<br />41
<br />SINGLE PROBE SOIL GAS MONITORING WELLS
<br />432
<br />lF
<br />60.0
<br />521,600.E
<br />$II5.W
<br />$49.6W.M
<br />$120.8
<br />$51,840.00
<br />$120.M
<br />61.640.00
<br />5120.00
<br />$51,NO.W
<br />$118.75
<br />42
<br />CHAIN LOM FENCING
<br />1
<br />LS
<br />58.08.8
<br />58,000.E
<br />538%0.00
<br />S3SO.0
<br />SSM0.00
<br />6.M0.00
<br />$15.000.00
<br />$15.000.8
<br />$33.00.00
<br />S3g.DWM
<br />38,165.00
<br />
|