Laserfiche WebLink
SUMMARY OF BIDS OPENED April 01, 2009 at 2:30 P.M. <br />Stanislaus County Fink Road Landfill <br />Landfill 2, Cell No. 5, Construction Project <br />Item No. <br />Item <br />Unit of <br />Measure <br />Estimated <br />Quantity <br />Teichert Construction <br />Rand.ha Construction, Ina <br />Whitaker Contractor Inc <br />Sierra Equipment Rental, Inc. <br />Granite Construction Co. <br />Item Price Total Item Price Total Item Price Total Item Price Total Item Price Total <br />(Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) <br />1 <br />Mobilization and Demobilization <br />LS <br />1 <br />$441,000.00 <br />$100,000.01) <br />$441,000. <br />$100,000. <br />$400,000.00 <br />$BO.W0.00 <br />$400.000.DO <br />$40.000.- <br />$280,000.00 <br />$22,000.00 <br />$280.000.040 <br />822.000. <br />$220,000.00 <br />$30.000.00 <br />$220.000.00 <br />$30.000. <br />$231,000.00 <br />$24.000.00 <br />$231,000.00 <br />$24.000.00 <br />2 Layout of Work Surveys ---.- tS 1_...--- <br />3 <br />Earth811 <br />-------- - ---� <br />CY <br />1,700 <br />$3.00 <br />$5,100.N <br />$5.00 <br />$8,500.00 <br />$2.00 <br />$3,400.00 <br />$1.00 <br />$1,700.-- <br />$4.00 --- <br />$6.800.00 <br />4 <br />Excevation <br />- <br />CY <br />1,327,300 <br />- <br />$1.15 <br />- <br />$1,526.395.00 <br />$1.37 <br />$1,818,401.0 <br />$1.62 <br />$2,150,226. <br />$1.75 <br />$2,322,775. <br />$225 <br />$2.986,425.00 <br />5 <br />Low Permeability Soil Layer <br />CY <br />20,600 <br />$2.25 <br />$46,350.0 <br />---_ $8.50 <br />$175,100. <br />$3.40 <br />$70,040. <br />$7.50 <br />$154,500. <br />$2.00 <br />-- $41,200.00 <br />6 <br />Subgrade Preparation <br />SF <br />785,500 <br />$0.10 <br />$78,550. <br />$0.02 <br />$15,710. <br />$0.12 <br />$94,260. <br />$0.25 <br />$196,375. <br />$0.12 <br />$94,200.00 <br />7 <br />(S) Geceynthetic Clay Lint <br />- -__ <br />SF <br />824,700 <br />$0.74 <br />_ <br />$610,278. <br />50.67 <br />-- <br />$552,549.00 <br />$0.69 <br />$569,043.0( <br />$0.62 <br />$511,314. <br />$0.62 <br />$511,314.00 <br />8 <br />(S) 60 mil HDPE Geomernbrane <br />SF <br />833,000 <br />$0.56 <br />$466,480. <br />$0.51 <br />- <br />$424,830. <br />- <br />$0.53 <br />$441,490. <br />- <br />$0.48 <br />$399,840. <br />$0.48 <br />$399,840.00 <br />9 <br />(S) Geocornposite Drainage Layer (S) <br />SF <br />16,100 <br />$0.71 <br />--_-- <br />571,431. <br />- $0.65 <br />$10,465.0 <br />$0.66 <br />$10,626. <br />$0.60 <br />$9,660. <br />$0.60 <br />$9,660.00 <br />10 <br />(S) Doubtable Fitter (S) <br />_--_ <br />SF <br />480,000 <br />$0.14 <br />$67,200.0 <br />$0. 33 <br />$62,400. <br />$0.13 <br />$62,400. <br />$0.12 <br />$57,600. <br />$0.12 <br />$57,600.00 <br />11 <br />LCRSDrainage Gravel <br />-- <br />CY <br />8,770 <br />$40.00 <br />--- <br />$350,800. <br />$38.00J$2- <br />260. <br />$34.00 <br />$298.180. <br />$40.00 <br />$350,800. <br />$40.00 <br />$350,800.00 <br />12 <br />Sump Gravel <br />CY <br />85 <br />$75.00 <br />-- <br />$6,375. <br />$130.00050. <br />$58.00 <br />-- $4,930.0 <br />$50.00 <br />$4,250.00 <br />$40.00 <br />$3,400.00 <br />13 <br />Base Operations Layer <br />CY <br />35,700 <br />$2.00 <br />$103,530. <br />$7.50 <br />700. <br />- $3.60 <br />$128,520. <br />$325 <br />$116,025.00 <br />$1.00 <br />$67,830.00 <br />14A -Side <br />Slope Operations Layer Stockp0ing <br />CY <br />23.000 <br />$1.50 <br />835.400.00 <br />$4.00 <br />$400. <br />$0.80 <br />318.88(7. <br />$1.00 <br />$23,600.00 <br />$1.00 <br />$23.600.0 <br />148 <br />-- <br />Side Slope Operations Layer Placement <br />CY <br />10,100 <br />$225 <br />- --- <br />$22,725.00 <br />$10.00 <br />000. <br />$320 <br />$32,320. <br />$4.00 <br />$40,400.00 <br />$225 <br />$22,725.00 <br />15 <br />64nch Diamter SDR 15.5 HPDE Pipe <br />LF <br />1,670 <br />$22.00 <br />$36,740.00 <br />$13.00710.0 <br />$16.00 <br />$26,720. <br />$25.00 <br />$41,750. <br />$12.00 <br />$20,040.00 <br />16 <br />8 -inch Diameter SDR 17.0 HDPE Pie <br />LF <br />925 <br />$24.00 <br />$22200.0 <br />$20.0000.0 <br />516.00 <br />$14,800. <br />$40.00 <br />$37,000.00 <br />$17.00 <br />$15,725.0117 <br />12 -brach Diamter SDR 15.5 HPD$ Pipe <br />LF <br />350 <br />$70.00 <br />$24,500. <br />$38.00300.00 <br />$48.00 <br />$16,800. <br />$100.00 <br />$35,000. <br />852.00 <br />$78,200.00 <br />18 <br />18 -inch Diamter SDR 15.5 HPDE Pipe <br />LF <br />180 <br />$90.00 <br />__$60.00 <br />$16200. <br />$67.0060. <br />$84.00 <br />$15,120.0 <br />$150.00 <br />--$27,000. <br />$00.00$16,200.00 <br />19 <br />24 -Indra Diameter CMP <br />LF <br />350 <br />$21,000. <br />$46.00100.00 <br />$88.00 <br />$30.800. <br />$60.00 <br />$21,000. <br />$80.00 <br />$28.000.0020 <br />3 -foot Diameter SOR 17.0 HDPE Manhole <br />FJ1 <br />1 <br />$6,500.00 <br />$6,500.00 <br />$5,000.0000.00 <br />$4,000.00 <br />$4,000. <br />$5,000.00 <br />$5,000.00 <br />$2,500.00 <br />$2,500.00 <br />21 <br />Expose and Prepare Existing Geomembrane Liner <br />LF <br />2,550 <br />$5.00 <br />$12,750.00 <br />-$50,250.00 <br />$8.0000.00 <br />$5.50 <br />$14,025. <br />$10.00 <br />$25,500. <br />$4.00 <br />$10,200.00 <br />22 <br />Perimeter and Side Slate Anchor Trenches <br />LF <br />3,350 <br />$15.00 <br />$7.00 <br />$23,450. <br />$720 <br />S24,120.0C <br />$15.00 <br />$50.250.00 <br />$18.00 <br />$00,300.00 <br />23 <br />(S) Underground Electrical Conduit and Wiring <br />LS <br />1 <br />$65.000.00 <br />--$60,0W.00 <br />$65,000. <br />520.000.00 <br />S20,000.0C <br />$13,000.00 <br />$13,000. <br />$125.000.00 <br />$125.000. <br />$65,000.00 <br />$65,000.00 <br />24 <br />(S) Electrical Connections and Pumps <br />LS <br />1 <br />$60.000.0 <br />$20,000.00 <br />520.000. <br />$16.000.00 <br />$16.000.0C <br />$15,000.00 <br />$15,000. <br />$60.000.00 <br />x,000.00 <br />25 <br />Concrete Spill Prevention Pads <br />EA <br />1 <br />52,000.00 <br />--- $2,000. <br />$7,500.00 <br />$7,500. <br />$7,000.00 <br />37,000.OC <br />$1,500.00 <br />$7,500.0 <br />$3,000.00 <br />$3,000.00 <br />26 <br />(S) Leak Location Survey <br />EA <br />1 <br />$26,400.00 <br />$26,400.00 <br />$16,500.00 <br />$16,500. <br />$19,000.00 <br />$19.000.0c <br />$15,000.00 <br />$15,000A <br />$20,000.00 <br />$20.000.00 <br />27 <br />RevegetationMydroseeding <br />AC <br />68 <br />$1,500.00 <br />$102,000. <br />$1,250.00 <br />S85,000A <br />$1,410.001$5,500.. <br />$1,620.00 <br />$110,160. <br />$1,200.00 <br />$81,600.00 <br />28 <br />Silt Fence <br />LF <br />7,100 <br />$2.30 <br />$16,330. <br />$2.00 <br />$14,200. <br />$220 <br />$3.00 <br />$21,300. <br />$1.10 <br />$7,810.00 <br />29 <br />Class 2 Road Base <br />-- <br />CY <br />200 <br />$50.00 <br />----$5,000.00 <br />$10,000. <br />$40.00 <br />$8,000. <br />$54.00 <br />$50.00 <br />$10,000. <br />$40.00 <br />$8,000.0 <br />30 <br />Selective Demolition <br />LS <br />1 <br />$5.000. <br />$3,000.00 <br />$3.000. <br />$5,500.00 <br />$5,000.00 <br />$5,000. <br />$5,000.00 <br />$5.000.00 <br />31 <br />Ditch Excavation <br />LF <br />4,500 <br />$4.00 <br />$18,000. <br />$2.00 <br />$9,000. <br />$2.50 <br />$3.25 <br />$14,625. <br />$2.00 <br />$9,000.00 <br />32 <br />Rlp Rap <br />LS <br />158.000.00 <br />$8.000. <br />$3.500.00 <br />$3,500. <br />$5,00000 <br />$2,500.00 <br />$2.500. <br />$6,000.00 <br />$6,000.00 <br />33 <br />Stormwater Pollution Prevention Plan <br />LS <br />1 <br />$7,500.00 <br />$7,500. <br />$8,500.00 <br />$8.500.0 <br />$22,000.00 <br />$22.000. <br />$5.000.00 <br />$5,000.0 <br />$2,000.00 <br />$2,000.00 <br />34 <br />Abandonment of ExIsimg Groundwater Monitoring <br />Wells 10 and 11 <br />LS <br />1 <br />$7,500.00 <br />$7,500. <br />$5.500.00 <br />$5.500. <br />$6.900.00 <br />$6,900.0C <br />$15,000.00 <br />$15,000. <br />$7.000.00 <br />$7,DDO.CD <br />35 <br />Instaltation of Greundvrater Mionbboring Wells 25 and <br />26 <br />LF <br />130 <br />$100.00 <br />$13.000.00 <br />$75.00 <br />$9.750.00 <br />$87.00 <br />$11,310.00 <br />$65.00 <br />$8,450. <br />$120.00 <br />$15,600.00 <br />36 <br />Transport of Water <br />1,000 gal <br />units <br />13,500 <br />units <br />$1.00 <br />$13,500. <br />$14.00 <br />$189,000.0 <br />$22.00 <br />$297,000.00 <br />$0.50 <br />$6,750. <br />$10.00 <br />$735,000.00 <br />$4,415,984.00 <br />$4.845,385.00 <br />$4,868,960.00 <br />$5,036,624.00 <br />$5,426,629.00 <br />D10ed.copc%Lnca1 ScuingsWenghorary Internet FilesbbRA2\Sunmhary ct-Is, Page 3 of 4 <br />C <br />