SUMMARY OF BIDS OPENED April 01, 2009 at 2:30 P.M.
<br />Stanislaus County Fink Road Landfill
<br />Landfill 2, Cell No. 5, Construction Project
<br />Item No.
<br />Item
<br />Unit of
<br />Measure
<br />Estimated
<br />Quantity
<br />Teichert Construction
<br />Rand.ha Construction, Ina
<br />Whitaker Contractor Inc
<br />Sierra Equipment Rental, Inc.
<br />Granite Construction Co.
<br />Item Price Total Item Price Total Item Price Total Item Price Total Item Price Total
<br />(Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures)
<br />1
<br />Mobilization and Demobilization
<br />LS
<br />1
<br />$441,000.00
<br />$100,000.01)
<br />$441,000.
<br />$100,000.
<br />$400,000.00
<br />$BO.W0.00
<br />$400.000.DO
<br />$40.000.-
<br />$280,000.00
<br />$22,000.00
<br />$280.000.040
<br />822.000.
<br />$220,000.00
<br />$30.000.00
<br />$220.000.00
<br />$30.000.
<br />$231,000.00
<br />$24.000.00
<br />$231,000.00
<br />$24.000.00
<br />2 Layout of Work Surveys ---.- tS 1_...---
<br />3
<br />Earth811
<br />-------- - ---�
<br />CY
<br />1,700
<br />$3.00
<br />$5,100.N
<br />$5.00
<br />$8,500.00
<br />$2.00
<br />$3,400.00
<br />$1.00
<br />$1,700.--
<br />$4.00 ---
<br />$6.800.00
<br />4
<br />Excevation
<br />-
<br />CY
<br />1,327,300
<br />-
<br />$1.15
<br />-
<br />$1,526.395.00
<br />$1.37
<br />$1,818,401.0
<br />$1.62
<br />$2,150,226.
<br />$1.75
<br />$2,322,775.
<br />$225
<br />$2.986,425.00
<br />5
<br />Low Permeability Soil Layer
<br />CY
<br />20,600
<br />$2.25
<br />$46,350.0
<br />---_ $8.50
<br />$175,100.
<br />$3.40
<br />$70,040.
<br />$7.50
<br />$154,500.
<br />$2.00
<br />-- $41,200.00
<br />6
<br />Subgrade Preparation
<br />SF
<br />785,500
<br />$0.10
<br />$78,550.
<br />$0.02
<br />$15,710.
<br />$0.12
<br />$94,260.
<br />$0.25
<br />$196,375.
<br />$0.12
<br />$94,200.00
<br />7
<br />(S) Geceynthetic Clay Lint
<br />- -__
<br />SF
<br />824,700
<br />$0.74
<br />_
<br />$610,278.
<br />50.67
<br />--
<br />$552,549.00
<br />$0.69
<br />$569,043.0(
<br />$0.62
<br />$511,314.
<br />$0.62
<br />$511,314.00
<br />8
<br />(S) 60 mil HDPE Geomernbrane
<br />SF
<br />833,000
<br />$0.56
<br />$466,480.
<br />$0.51
<br />-
<br />$424,830.
<br />-
<br />$0.53
<br />$441,490.
<br />-
<br />$0.48
<br />$399,840.
<br />$0.48
<br />$399,840.00
<br />9
<br />(S) Geocornposite Drainage Layer (S)
<br />SF
<br />16,100
<br />$0.71
<br />--_--
<br />571,431.
<br />- $0.65
<br />$10,465.0
<br />$0.66
<br />$10,626.
<br />$0.60
<br />$9,660.
<br />$0.60
<br />$9,660.00
<br />10
<br />(S) Doubtable Fitter (S)
<br />_--_
<br />SF
<br />480,000
<br />$0.14
<br />$67,200.0
<br />$0. 33
<br />$62,400.
<br />$0.13
<br />$62,400.
<br />$0.12
<br />$57,600.
<br />$0.12
<br />$57,600.00
<br />11
<br />LCRSDrainage Gravel
<br />--
<br />CY
<br />8,770
<br />$40.00
<br />---
<br />$350,800.
<br />$38.00J$2-
<br />260.
<br />$34.00
<br />$298.180.
<br />$40.00
<br />$350,800.
<br />$40.00
<br />$350,800.00
<br />12
<br />Sump Gravel
<br />CY
<br />85
<br />$75.00
<br />--
<br />$6,375.
<br />$130.00050.
<br />$58.00
<br />-- $4,930.0
<br />$50.00
<br />$4,250.00
<br />$40.00
<br />$3,400.00
<br />13
<br />Base Operations Layer
<br />CY
<br />35,700
<br />$2.00
<br />$103,530.
<br />$7.50
<br />700.
<br />- $3.60
<br />$128,520.
<br />$325
<br />$116,025.00
<br />$1.00
<br />$67,830.00
<br />14A -Side
<br />Slope Operations Layer Stockp0ing
<br />CY
<br />23.000
<br />$1.50
<br />835.400.00
<br />$4.00
<br />$400.
<br />$0.80
<br />318.88(7.
<br />$1.00
<br />$23,600.00
<br />$1.00
<br />$23.600.0
<br />148
<br />--
<br />Side Slope Operations Layer Placement
<br />CY
<br />10,100
<br />$225
<br />- ---
<br />$22,725.00
<br />$10.00
<br />000.
<br />$320
<br />$32,320.
<br />$4.00
<br />$40,400.00
<br />$225
<br />$22,725.00
<br />15
<br />64nch Diamter SDR 15.5 HPDE Pipe
<br />LF
<br />1,670
<br />$22.00
<br />$36,740.00
<br />$13.00710.0
<br />$16.00
<br />$26,720.
<br />$25.00
<br />$41,750.
<br />$12.00
<br />$20,040.00
<br />16
<br />8 -inch Diameter SDR 17.0 HDPE Pie
<br />LF
<br />925
<br />$24.00
<br />$22200.0
<br />$20.0000.0
<br />516.00
<br />$14,800.
<br />$40.00
<br />$37,000.00
<br />$17.00
<br />$15,725.0117
<br />12 -brach Diamter SDR 15.5 HPD$ Pipe
<br />LF
<br />350
<br />$70.00
<br />$24,500.
<br />$38.00300.00
<br />$48.00
<br />$16,800.
<br />$100.00
<br />$35,000.
<br />852.00
<br />$78,200.00
<br />18
<br />18 -inch Diamter SDR 15.5 HPDE Pipe
<br />LF
<br />180
<br />$90.00
<br />__$60.00
<br />$16200.
<br />$67.0060.
<br />$84.00
<br />$15,120.0
<br />$150.00
<br />--$27,000.
<br />$00.00$16,200.00
<br />19
<br />24 -Indra Diameter CMP
<br />LF
<br />350
<br />$21,000.
<br />$46.00100.00
<br />$88.00
<br />$30.800.
<br />$60.00
<br />$21,000.
<br />$80.00
<br />$28.000.0020
<br />3 -foot Diameter SOR 17.0 HDPE Manhole
<br />FJ1
<br />1
<br />$6,500.00
<br />$6,500.00
<br />$5,000.0000.00
<br />$4,000.00
<br />$4,000.
<br />$5,000.00
<br />$5,000.00
<br />$2,500.00
<br />$2,500.00
<br />21
<br />Expose and Prepare Existing Geomembrane Liner
<br />LF
<br />2,550
<br />$5.00
<br />$12,750.00
<br />-$50,250.00
<br />$8.0000.00
<br />$5.50
<br />$14,025.
<br />$10.00
<br />$25,500.
<br />$4.00
<br />$10,200.00
<br />22
<br />Perimeter and Side Slate Anchor Trenches
<br />LF
<br />3,350
<br />$15.00
<br />$7.00
<br />$23,450.
<br />$720
<br />S24,120.0C
<br />$15.00
<br />$50.250.00
<br />$18.00
<br />$00,300.00
<br />23
<br />(S) Underground Electrical Conduit and Wiring
<br />LS
<br />1
<br />$65.000.00
<br />--$60,0W.00
<br />$65,000.
<br />520.000.00
<br />S20,000.0C
<br />$13,000.00
<br />$13,000.
<br />$125.000.00
<br />$125.000.
<br />$65,000.00
<br />$65,000.00
<br />24
<br />(S) Electrical Connections and Pumps
<br />LS
<br />1
<br />$60.000.0
<br />$20,000.00
<br />520.000.
<br />$16.000.00
<br />$16.000.0C
<br />$15,000.00
<br />$15,000.
<br />$60.000.00
<br />x,000.00
<br />25
<br />Concrete Spill Prevention Pads
<br />EA
<br />1
<br />52,000.00
<br />--- $2,000.
<br />$7,500.00
<br />$7,500.
<br />$7,000.00
<br />37,000.OC
<br />$1,500.00
<br />$7,500.0
<br />$3,000.00
<br />$3,000.00
<br />26
<br />(S) Leak Location Survey
<br />EA
<br />1
<br />$26,400.00
<br />$26,400.00
<br />$16,500.00
<br />$16,500.
<br />$19,000.00
<br />$19.000.0c
<br />$15,000.00
<br />$15,000A
<br />$20,000.00
<br />$20.000.00
<br />27
<br />RevegetationMydroseeding
<br />AC
<br />68
<br />$1,500.00
<br />$102,000.
<br />$1,250.00
<br />S85,000A
<br />$1,410.001$5,500..
<br />$1,620.00
<br />$110,160.
<br />$1,200.00
<br />$81,600.00
<br />28
<br />Silt Fence
<br />LF
<br />7,100
<br />$2.30
<br />$16,330.
<br />$2.00
<br />$14,200.
<br />$220
<br />$3.00
<br />$21,300.
<br />$1.10
<br />$7,810.00
<br />29
<br />Class 2 Road Base
<br />--
<br />CY
<br />200
<br />$50.00
<br />----$5,000.00
<br />$10,000.
<br />$40.00
<br />$8,000.
<br />$54.00
<br />$50.00
<br />$10,000.
<br />$40.00
<br />$8,000.0
<br />30
<br />Selective Demolition
<br />LS
<br />1
<br />$5.000.
<br />$3,000.00
<br />$3.000.
<br />$5,500.00
<br />$5,000.00
<br />$5,000.
<br />$5,000.00
<br />$5.000.00
<br />31
<br />Ditch Excavation
<br />LF
<br />4,500
<br />$4.00
<br />$18,000.
<br />$2.00
<br />$9,000.
<br />$2.50
<br />$3.25
<br />$14,625.
<br />$2.00
<br />$9,000.00
<br />32
<br />Rlp Rap
<br />LS
<br />158.000.00
<br />$8.000.
<br />$3.500.00
<br />$3,500.
<br />$5,00000
<br />$2,500.00
<br />$2.500.
<br />$6,000.00
<br />$6,000.00
<br />33
<br />Stormwater Pollution Prevention Plan
<br />LS
<br />1
<br />$7,500.00
<br />$7,500.
<br />$8,500.00
<br />$8.500.0
<br />$22,000.00
<br />$22.000.
<br />$5.000.00
<br />$5,000.0
<br />$2,000.00
<br />$2,000.00
<br />34
<br />Abandonment of ExIsimg Groundwater Monitoring
<br />Wells 10 and 11
<br />LS
<br />1
<br />$7,500.00
<br />$7,500.
<br />$5.500.00
<br />$5.500.
<br />$6.900.00
<br />$6,900.0C
<br />$15,000.00
<br />$15,000.
<br />$7.000.00
<br />$7,DDO.CD
<br />35
<br />Instaltation of Greundvrater Mionbboring Wells 25 and
<br />26
<br />LF
<br />130
<br />$100.00
<br />$13.000.00
<br />$75.00
<br />$9.750.00
<br />$87.00
<br />$11,310.00
<br />$65.00
<br />$8,450.
<br />$120.00
<br />$15,600.00
<br />36
<br />Transport of Water
<br />1,000 gal
<br />units
<br />13,500
<br />units
<br />$1.00
<br />$13,500.
<br />$14.00
<br />$189,000.0
<br />$22.00
<br />$297,000.00
<br />$0.50
<br />$6,750.
<br />$10.00
<br />$735,000.00
<br />$4,415,984.00
<br />$4.845,385.00
<br />$4,868,960.00
<br />$5,036,624.00
<br />$5,426,629.00