My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Grading <br />The first lift of refuse in Module 5B is placed cover the lined area with 3% slope <br />to the south to direct storm water runoff of the cell and into the storm water pond. <br />This is an ongoing task expected to be completed by mid-November. <br />2. Drainage <br />Soil berms will be installed along the downslope edges of Module 5B to control <br />surface storm water runoff (Figure 1). Down drains will be installed at the end of <br />the soil berms to convey storm water down the slope and into the storm water <br />pond as needed. This task is expected to be completed by mid-November, <br />weather permitting. <br />3. Erosion/Sedimentation Control <br />The side slopes of Module 513's operations layer, new drainage ditch slopes and <br />other disturbed areas around Module 5B have some established vegetation. <br />N:\1 North County\Winterization\2018\2018-10-9-NC-18-19 Winterization Plan.docx <br />NC -2018-19 Winterization Plan Page 3 of 3 Revised 10/12/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.