My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014265
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
24707
>
2600 - Land Use Program
>
PA-2100126
>
SU0014265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 10:42:44 AM
Creation date
7/19/2021 2:36:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014265
PE
2625
FACILITY_NAME
PA-2100126
STREET_NUMBER
24707
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25010006
ENTERED_DATE
6/29/2021 12:00:00 AM
SITE_LOCATION
24707 S BIRD RD
RECEIVED_DATE
7/7/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . Fire control room locations shall be approved the fire code official prior to the issuance of <br /> construction permit . <br /> J . Provide a truck turning template which clearly shows the truck turning radius of 30 ' inside <br /> and 50' outside . Truck turning template shall show all ingress and egress paths available . <br /> 2 . Engineering and building permit applications received by our offices are subject to the current fee <br /> schedule for South San Joaquin County Fire Authority . Contact our offices for additional information . <br /> a . Application processing fees and minimum plan review fees are due at time of submittal of <br /> construction documents . <br /> b . Additional plan review fees , minimum inspection fees and administrative fees are calculated <br /> on approval of project and shall be paid prior to issuance of permit . <br /> c . Permit holder is responsible for any additional inspection fees incurred , and shall be paid <br /> prior to final inspection . <br /> 3 . Additional permits will be required for each separate tenant improvement . Construction <br /> documents shall be submitted to South San Joaquin County Fire Authority for review and approval <br /> prior to the start of construction or demolition . <br /> a . Prior to occupancy of each new business, the tenant shall contact South San Joaquin County <br /> Fire Authority for a new business inspection . Additional fees may be required for New <br /> Business , Annual and Operational Fire Permits . All fees shall be paid prior to approval of <br /> inspections . <br /> 4 . Prior to construction , all - weather fire apparatus access roads shall be installed . Fire apparatus <br /> access roads during construction shall have a minimum 20' unobstructed width in accordance with <br /> CFC § 503 . <br /> 5 . All hydrants shall be installed , inspected and tested prior to bringing combustible materials onsite , <br /> including storage . <br /> 6 . Knox boxes shall be required . The operator of the building shall immediately notify the Fire Authority <br /> and provide the new key where a lock is changed or rekeyed . The key to such shall be secured in <br /> the key box . <br /> 7 . Building and each tenant space shall be provided with approved address identification in <br /> accordance with CFC § 505 . <br /> 8 . Prior to final inspection , emergency radio responder coverage shall be tested to confirm coverage <br /> areas . It is beneficial for the applicant to conduct testing at foundation as retrofitting for the conduit <br /> is costly . If coverage is inadequate, a separate permit for emergency radio responder coverage shall <br /> be submitted to SSJCFA for review and approval prior to installation . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.