Laserfiche WebLink
Administrator by the Emergency Coordinator. Verify with VWNA EHS&S personnel, the necessary <br />agencies with which to report and the time allowed. (Notification to the NRC may be required <br />within 1 hour.) <br />11. PLANT TRAINING PROGRAM <br />This facility will conduct training in the following areas on an annual basis. <br />• Emergency Response for on-site releases of hazardous substances per 29 CFR 1910.120 <br />• Hazardous Communication Training per 29 CFR 1910.1200 <br />• Chemical Hygiene Plan per 29 CFR 1910.1450 <br />• Respirator Selection and Use per 29 CFR 1910.134 <br />• PPE <br />12. AMENDMENTS TO THE CONTINGENCY PLAN <br />The Contingency Plan will be reviewed and immediately amended, if necessary, whenever: <br />• The facility permit is revised. <br />• The plan fails to function well in an emergency. <br />• The facility changes in its design, construction, operations, maintenance or other <br />circumstances in a way that materially increases the potential for fires, explosions or release <br />of hazardous waste or hazardous waste constituents, or changes in the response necessary <br />in an emergency. <br />• The list of Emergency Coordinators changes. <br />• The list of emergency equipment changes. <br />11 <br />