My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 4:48:16 PM
Creation date
8/16/2021 2:14:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\li \1% \ti \1% \1 ' di LED \ti \1% <br /> ir <br /> CERTIFICATE OF COMPLETION <br /> Interstitial Vacuum Test (IVT) <br /> For The <br /> PLASTEEL® Double-Wall Underground Tank <br /> I. Third Party Evaluation: This leak tightness Installation Location: <br /> test method has been third party evaluated per the Nitsl <br /> Alternate EPA Test Protocols for Plasteel International. 95 <br /> .vI. <br /> %��• The third party environmental consulting firm that <br /> performed the evaluation was: <br /> �. Ken Wilcox Associates, Inc. <br /> 19401 E.40 Highway, Suite 100 <br /> Independence,MO 64055 IV. Test Results: The interstitial vacuum test was <br /> 816 795-7997 performed per Appendix B. The following data was <br /> recorded: :i1515 <br /> A copy of the evaluation is on file at each licensed WN <br /> ►!% PLASTEEL®tank manufacturer and at: Nominal Tank Capacity: .1. <br /> !ice• (Gallons) .40. <br /> Plasteel International Inc. Primary Tank Product: <br /> 2541 State Street (air,gasoline, diesel,water) ':1: <br /> Carlsbad,CA 92008 !K <br /> (760)729-1093 Required Test Period: <br /> (Hours,per Appendix B,Figure 6.0) <br /> •\ri .1. <br /> II. Tank Description: Initial Gauge Reading: inches Hg. !i`• <br /> Date Time am/pm <br /> . Capacity: Gallons Final Gauge Reading: inches H <br /> g•�l1i i!. <br /> Date Time am/pm <br /> Jacketed: ' <br /> \1. Total Elapsed Time Period: a <br /> Composite: (Hours) <br /> Compartmented: Yes No Pass Fail (Initial) <br /> V. Statement of Test: I certify that the PLASTEEL® <br /> U.L.Number Double-Wall tank described above has been tested leak <br /> tight per Appendix B of the PLASTEEL® Tank <br /> ��. Installation Instructions. <br /> Tank Manufacturer: Testing Company: <br /> Name: Name: <br /> Address: Address: il ' <br /> III. Installation Information: Telephone: <br /> Tank Owner: <br /> Signatures, <br /> Name: <br /> Printed Name <br /> a Address: \I% <br /> Title <br /> \r, Date <br /> IVT-CERT 699 <br /> of\ti <br /> ��. 71�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.