My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2800 - Aboveground Petroleum Storage Program
>
PR0516327
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 6:08:55 PM
Creation date
8/19/2021 8:45:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516327
PE
2832
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED SCHEDULE FOR MODIFICATIONS <br /> The Facility has proposed to complete the following projects according to the schedule shown <br /> below, which will ensure the site is in compliance with the SPCC Plan requirements of 40 <br /> CFR 112. The Professional Engineer signed and certified the SPCC Plan with the expectation <br /> that the implementation schedule would be adhered to and completed as proposed. The list <br /> and schedule below include a location for the facility representative(s)to sign as each project <br /> is completed. <br /> Project Scheduled Date of Signature and <br /> Completion Date Completed (Note 1) <br /> 1. Replace two salvage oil tanks or Estimated to occur by <br /> provide adequate secondary the end of the first (Signature) <br /> containment: 1,750-gal and 450-gal. quarter of 2017. <br /> (Date) <br /> 2. Install a level gauge for Generator A Within 30 days of the W Z <br /> date of this Plan (Signature) <br /> (Date) <br /> 3. Install secondary containment around Estimated to occur by <br /> Generator Tanks A, B,and C. the end of the first (Signature) <br /> quarter of 2017. <br /> Date) <br /> 4. Install secondary containment around Within 60 days of the <br /> Biosol containers/tanks. date of this Plan (Signature) <br /> (Date) <br /> 5. Prevent run-on of rainwater into the Blue Estimated to occur by <br /> Storage Building. Two options include the end of the first (Signature) <br /> installing a roll-over berm or a French quarter of 2017. <br /> drain/trench at the north entrance. (Date) <br /> 6. Perform integrity testing for tanks and Estimated to occur by <br /> obtain reports that meet the STI SP-00 i the end of the first (Signature) <br /> requirements: 1,750-and 450-gallon quarter of 2017. <br /> salvage oil tanks. (Date) <br /> Note 1: By signing here, I certify that the work was completed on the date noted, and it was <br /> performed as proposed by the Professional Engineer at the time this Plan was signed and <br /> certified. <br /> 2 August 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.