Laserfiche WebLink
N <br /> PROPOSED SCHEDULE FOR MODIFICATIONS <br /> The Facility has proposed to complete the following projects according to the schedule shown <br /> below, which will ensure the site is in compliance with the SPCC Plan requirements of 40 <br /> CFR 112. The Professional Engineer signed and certified the SPCC Plan with the expectation <br /> that the implementation schedule would be adhered to and completed as proposed. The list <br /> and schedule below include a location for the facility representative(s)to sign as each project <br /> is completed. <br /> Project Scheduled Date of Signature and <br /> Completion Date Completed (Note 1) <br /> 1. Replace two salvage oil tanks or Estimated to occurla_ <br /> provide adequate secondary the end of the first (Signature) <br /> containment: 1,750-gal and 450-gal. quarter of 2017. <br /> (Date) <br /> 2. Install a level gauge for Generator A Within 30 days of the W x S JD A <br /> date of this Plan (Signature) <br /> (Date) 9-3-/L <br /> 3. Install secondary containment around Estimated to occur by <br /> Generator Tanks A,B, and C. the end of the first (Signature) <br /> quarter of 2017. <br /> (Date) <br /> 4. Install secondary containment around Within 60 days of the <br /> Biosol containers/tanks. date of this Plan (Signature) <br /> (Date) <br /> 5. Prevent run-on of rainwater into the Blue Estimated to occur by <br /> Storage Building. Two options include the end of the first (Signature) <br /> installing a roll-over berm or a French quarter of 2017. <br /> drain/trench at the north entrance. Date) <br /> 6. Perform integrity testing for tanks and Estimated to occur by <br /> obtain reports that meet the STI SP-001 the end of the first (Signature) <br /> requirements: 1,750-and 450-gallon quarter of 2017. <br /> salvage oil tanks. ate) <br /> Note 1: By signing here, I certify that the work was completed on the date noted, and it was <br /> performed as proposed by the Professional Engineer at the time this Plan was signed and <br /> certified. <br /> RECEIVED <br /> SEP 262016 <br /> 2 August 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />