Laserfiche WebLink
5208 S.Lawton Company Name: <br /> Tulsa OK,74107 Owens Brockway <br /> 918-998-0862 Location: Tracy Ca <br /> AC U R E N Inspection Date: 12/15/2016 <br /> Storage Tank Inspection Check List <br /> Equipment#: Emergency Generator C Fuel Tank <br /> Item Inspection Task Y N N/A Comments &Observations <br /> Pre-Inspection Verify vessel isolated and locked out X <br /> 1 <br /> 2 Verify vessel drained and decontaminated. X <br /> 3 Verify atmospheric testing has been X <br /> performed. <br /> 4 Verify adequate ventilation provided. X <br /> 5 Verify adequate staging and lighting provided. X Per Acuren and STI safety policies andguidelines <br /> 6 Verify a confined space entry permit issued. X <br /> 7 Ensure appropriate safety equipment staged. X <br /> 8 Ensure appropriate personal protective X Per Acuren and STI safety policies and <br /> equipment is been utilized. guidelines <br /> 9 Ensure inspection areas have been X Satisfactory <br /> adequately prepared. <br /> 10 Ensure all personnel working on system have <br /> been briefed on potential hazards. X Tailgate Safety Meeting <br /> 11 Ensure previous inspection information has X <br /> been supplied to inspectors. <br /> 11.1 Minimum wall thickness; X Reference attached calculation sheet. <br /> 11.2 Nominal wall thickness; X Top-.135"(10 Ga),Sides and Bottom- <br /> unknown, no access <br />