My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1311
>
1600 - Food Program
>
PR0547032
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 1:32:03 PM
Creation date
8/19/2021 12:56:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547032
PE
1625
FACILITY_ID
FA0026658
FACILITY_NAME
RAISING CANE'S #529
STREET_NUMBER
1311
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
208260080
CURRENT_STATUS
01
SITE_LOCATION
1311 E YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 10 02 13 <br /> RECYCLED POLYVINYL SAFETY FLOORING INSTALLATIONS <br /> 1.GENERAL <br /> 1.01 SUMMARY <br /> A. This section includes furnishing all materials, labor, equipment, and related services <br /> necessary to supply and install recycled Polyvinyl safety flooring (Eco-Grip) as <br /> indicated in the contract documents, and in compliance with applicable codes. <br /> 1.2 RELATED SECTIONS <br /> A. Division 03 Section"Cast in Place Concrete"for general building applications of <br /> concrete. <br /> B. Division 22 Section"Plumbing"for drain,floor sink,floor troughs,cleanouts,and <br /> plumbing penetration conditions <br /> 1.3 INFORMATIONAL SUBMITTALS <br /> A. Product Data:Submit manufacturer's product data and installation instructionsfor <br /> Commercial kitchen applications. <br /> B. Samples: Submit 3 Eco-Grip samples in the color reflected on the finish drawings. <br /> C. Certification: Submit evidence of contractor qualifications as outlined under 1.05 <br /> Quality Assurance. Provide letter from the manufacturer attesting to the installer <br /> certification. <br /> 1.4 CLOSEOUT SUBMITTALS <br /> A. Maintenance Data: Provide detailed Eco-Grip maintenance instructions. <br /> B. Warranties: Provide manufacturer and installation warranties as noted under <br /> Section 1.05 Quality Assurance. <br /> 1.5 QUALITY ASSURANCE <br /> A. Contractor will assure compliance with 1.06 Project Conditions to allow for proper <br /> installation. <br /> B. Comply with local governing codes and regulations. <br /> C. Use Eco-Grip factory trained installers that are certified and recommended by <br /> manufacturer. <br /> D. Manufacturer must provide a limited 10-year product warranty against manufacturing <br /> defects. (With continued use of Eco-Grip Floor Cleaner) <br /> E. Eco-Grip factory trained installer must provide a 1-year installation defect warranty. <br /> RECYCLED POLYVINYL SAFETY FLOORING INSTALLATIONS <br /> 100213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.