My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1311
>
1600 - Food Program
>
PR0547032
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 1:32:03 PM
Creation date
8/19/2021 12:56:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547032
PE
1625
FACILITY_ID
FA0026658
FACILITY_NAME
RAISING CANE'S #529
STREET_NUMBER
1311
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
208260080
CURRENT_STATUS
01
SITE_LOCATION
1311 E YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6 PROJECT CONDITIONS <br /> A. Comply with manufacturer's written instructions for substrate temperature and <br /> humidity, ambient temperature and humidity, ventilation, and other conditions <br /> affecting the installation of Eco-Grip. <br /> B. Environmental Limitations: Do not install Eco-Grip flooring until building is enclosed <br /> and weatherproof, wet work is complete,and the HVAC system or temporary heating <br /> maintains temperature and humidity at normal occupancy levels. <br /> C. Acclimate Eco-Grip flooring parts for a minimum of 24 hours to the ambient <br /> temperature and humidity levels of spaces in which they are to be installed <br /> D. Verify that concrete substrate conditions provide for slope to drains allowing water <br /> flow without assistance to drainage points.'/4" per 1-foot average slope for radius'to <br /> 4'from drain center points are required. <br /> E. Verify that floor drains are set''/." above with finished concrete surface, and that <br /> floor waste/grease sinks and troughs are level and set''/." above the finished <br /> concrete surface to prevent floor drainage to those elements once the''/." Eco-Grip <br /> floor is installed tight to these penetrations. <br /> F. Slab substrates must be dry and free of curing compounds,sealers, hardeners,and <br /> other materials whose presence would interfere with bonding of adhesive. <br /> G. Verify a clean,dry, and structurally sound surface to accept adhesive,free of cracks, <br /> ridges,depression,scales,and foreign deposits of any kind. <br /> H. Verify that sub-floor concrete surfaces are ready for resilient flooring installation by <br /> testing moisture emission rate and alkalinity, in accordance with ASTM F 710;obtain <br /> instructions if test results are not within limits recommended by resilient flooring <br /> manufacturer and adhesive materia Is manufacturer. <br /> a. Reference ASTM F 710-Standard Practice for Preparing Concrete Floors to <br /> Receive Resilient Flooring. <br /> I. Do not begin installation of Eco-Grip flooring until all Project Conditions have been <br /> met. <br /> 2. PRODUCTS <br /> 2.1 APPROVED PRODUCTS <br /> A. Eco-Grip Safety Flooring as manufactured by Allied Industries International,Inc. <br /> 1. Eco-Grip Commercial Flooring.Sheets 5'x 8' in '/4"thickness with color chosen by <br /> architect as noted on plans. <br /> 2. Eco-Grip Epoxy Flooring Adhesive. <br /> 3. Eco-Grip V-Rod,welding rod or SpeeclFlex Liquid WeldingSystem. <br /> 4. Eco-Grip Polyvinyl Cove Base Cap (high impact Polyvinyl),Stainless Steel Base Cap, <br /> or Aluminum Base Cap. <br /> 5.Stainless Steel drain rings and transition strips,and#10 stainless screws and <br /> lead anchors as required <br /> 6. Eco-Grip sealants <br /> 7. Other installation materials as required and supplied by Eco-Grip. <br /> B. Eco-Grip Safety Flooring must meet the following test standards: <br /> I.ASTM G-21 Bacteria & Mildew Resistance Excellent <br /> 2.ASTM D-751 Breaking Strength (md) 4051bs <br /> RECYCLED POLYVINYL SAFETY FLOORING INSTALLATIONS <br /> 10 02 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.