Laserfiche WebLink
3.ASTM D-751 Breaking Strength (cmd) 723lbs <br /> 4.ASTM D-2047 Coefficient of Friction (avg) Dry 1.31 <br /> 5.ASTM D-695 Compressive Strength @ 20%Deformation 641 psi <br /> 6.ASTM D-751 Elongation (md)76.5% <br /> 7.ASTM D-751 Elongation (cmd) 88.5% <br /> 8.ASTM E-648 Critical Radiant Flux 1.05W/cm2—Type 1 NFPA fire classification <br /> 9.ASTM E-648 Burn Distance 12 cm <br /> 10. Shore A Hardness 85-90 avg <br /> 11. ASTM D-751 Tear Strength (md) 76.5lbs <br /> 12. ASTM D-751 Tear Strength (cmd) 84lbs <br /> 13. NFSI UWT-101A Coefficient of Friction Standard >.06 <br /> 3. EXECUTION <br /> 3.1 INSTALLATION <br /> A. Follow manufacturer recommendations for laying sheets out. All welded joints must be <br /> offset with flooring sheets installed in an Ashlarfashion. <br /> B. Flooring must be cut tight to all penetrations. <br /> C. Adhere the floor material with Eco-Grip 2-part Epoxy mastic using the manufacturer's <br /> recommended trowel notch size (3/32). <br /> D. Eco-Grip seal cartridge adhesive/sealant should be used to seal base top and cap per the <br /> "Base Cap Detail" drawing, around all drains and sinks, and at all floor penetrations and <br /> transitions. <br /> E. Roll floor into adhesive with 1001b roller immediately <br /> F. Install floor drains in accordance with drawing for"Stainless Collar Floor Drain Detail" <br /> drawings.Stainless steel drain rings are to be routed into floor surface and mounted flush <br /> with top of flooring.Secure drain rings using stainless steel fasteners and lead anchors that <br /> will properly anchor the ring to the substrate. <br /> D. Install cove base as recommended by manufacturer with proper adhesive and top sealant. <br /> E. Route out V-grooves between sheets and weld all seams using Eco-Grip 7mm V- <br /> shaped welding rod or Eco-Grip SpeedFlex liquid weld system along with specified <br /> tools in accordance with Eco-Grip Floorings installation guidelines. <br /> F. 16-gauge Stainless steel transitions are to be installed at all doorways and transition <br /> areas. Use stainless steel fasteners,and lead anchors to secure. <br /> G. All exposed edges are to be sealed with manufacturer's recommended sealant to assure <br /> a watertight seal. <br /> 3.2 CLEANING <br /> A. Sweep-clean the floor after installation and clear area of scrap materials.The floor can be <br /> saturated and then deck brushed, power washed, or power scrubbed (only us the 3M <br /> Green Cleaning Pad)to remove construction debris. <br /> B. Installer must provide two copies of manufacturers cleaning recommendations for <br /> contractor and owner use. <br /> End of Section 10 02 13 <br /> RECYCLED POLYVINYL SAFETY FLOORING INSTALLATIONS <br /> 10 02 13 <br />